Loading...
Riverchase Montessori-CS130809 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-243R-R, Riverchase Montessori School, a zoning change request from PD- 243-R (Planned Development-243-Retail) to PD-243R-R (Planned Development- 243 Revision-Retail), to allow the development of a 14,060-square-foot daycare/school with a future 2,400-square-foot retail building on approximately two (2) acres of property located on the south side of East Sandy Lake Road, 250 feet east of Riverview Drive, at the request of Kanwar Suri, represented by Robert Schneeberg, Gonzalez & Schneeberg. STAFF REP.: Matt Steer PROJECT ID# PD-13-0053 DRC DATE: August 9, 2013 and September 5, 2013 CONTACT: Michael Garza, P.E., Civil Engineer, 972-304-7019 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. There will be additional comments during detailed engineering plan review. 2. The median opening will need to line up with the driveway on the north side of E. Sandy Lake Road. 3. Make the fire hydrant private. 4. Show the offsite drainage area, does the storm drain need to be public? DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Riverchase Montessori School Addition, Lot 1, Block A, Minor Plat, to establish setbacks, fire lane and easements, to allow the development of a 14,060 square foot day care/school with a future 2,400-square-foot building on approximately two (2) acres of property located on the south side of East Sandy Lake Road, 250 feet east of Riverview Drive, at the request of Kanwar Suri, represented by Robert Schneeberg, Gonzalez & Schneeberg. STAFF REP.: Matt Steer PROJECT ID# MPNR-13-0054 DRC DATE: August 9, 2013 and September 5, 2013 CONTACT: Michael Garza, P.E., Civil Engineer, 972-304-7019 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. No water easement needed for the private hydrant. 2. Is the storm drain easement needed?