Loading...
Northaven Addn-CS130809 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-133R6-SF-7, Northaven Addition, a zoning change request from PD-133-HC (Planned Development-133-Highway Commercial) to PD-133R6-SF-7 (Planned Development-133 Revision 6-Single Family-7), to allow the development of 13 single-family lots and four (4) common area lots on 5.41 acres of property located along the south side of S.H. 121, approximately 260 feet west of North Denton Tap Road and to amend the Land Use Map of the Coppell 2030 Comprehensive Master Plan from “Freeway Special District” to “Residential Neighborhood”, at the request of AMBE Hospitality Group, represented by Tommy Cansler, Timberland Creek Companies, Inc. STAFF REP.:PROJECT ID# PD-13-0055 Gary Sieb DRC DATE: August 9, 2013 and September 5, 2013 CONTACT: Michael Garza, P.E., Civil Engineer, 972-304-7019 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. Place the sidewalk outside of the TXDOT ROW in an easement. 2. We will need a copy of TXdot approval for driveway and drainage. 3. We will require a 20’ easement for the utilities. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Northaven Addition, Preliminary Plat, a preliminary plat to subdivide 5.41 acres of property to permit the development of 13 single-family lots and four (4) common area lots on land located along the south side of S.H. 121, approximately 260 feet west of North Denton Tap Road, at the request of AMBE Hospitality Group, represented by Tommy Cansler, Timberland Creek Companies, Inc. STAFF REP.: Gary Sieb PROJECT ID# PPR-13-0056 DRC DATE: August 9, 2013 and September 5, 2013 CONTACT: Michael Garza, P.E., Civil Engineer, 972-304-7019 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. Why do we need a 10’ sidewalk easement? 2. Make all easements 20’.