Loading...
Westhaven 1-LR130827 Report# Ellerbee-Walczak, Inc. Densities / Overtime GEOTECHNICAL ENGINEERING& CONSTRUCTION MATERIALS TESTING SERVICES 4501 Broadway Ave. • P.O. Box 14809 • Haltom City,Texas 76117 Depth Checks / Overtime Office 817-759-9999•Fax 817-759-1888 Tech Hours / Overtime Nuclear Density Worksheet Gauge Ser.#(Circle One) HUM HUM HUM CPN CPN -TPcX�e #1900 #2461 #2236 #6863 #7103 -5 Technician: Teddy -Kruger-Stoney -Jarad -Stan / Proctors 1 2 3 4 5 Date: Project:_1/4___ ,NR Dry Location: Op. Moist. Client: Circle One: Excavation Utilities Paving, Desc Proc #CIF % % Depth Gauge Counts: DD M # Dry Mois Dens Checks 1 1 2 3 1 cc ( 4 5 6 eit7 rg 7 ' 8 9 10 Des: (A)-Waterline, (B)-San Sewer,(C)-Storm Drain,(D)-Water Serv,(E)-San Serv,(F)-Modified Subgrade,(G)-Subgrade, (H)-Street Fill, (I)-Lot Fill,(J)-Building Fill,(K)-Dam Fill,(L)-Box Culvert Backfill,(M)-Flex Base,(N)-Conduits,(P)-Manholes Density tests were performed on: Work in progress trench -Sloping decline trench Test locations excavated prior to techs arrival -Test locations excavated in the presence of technician Probe Depth: 2" 4" 6" 8" 10" 12" TIME START Minimum Density Requirement= % TIME FINISH