Bellacere Addn-CS130905
MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To: Rick O’Dell, Construction Inspector Engineering
From: Frank Garza, Street Department
Date: September 5, 2013
RE: Final Walk-thru Bellacere 9/5/13
1.Need to seal all joints going up the curb on all of street and alley.
2.Need to remove redwood on all joints that are on curbs, sidewalk and alley and seal
them.
3.Need to rout cracks and seal them on street and alley. They are marked with paint.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT