Loading...
Bellacere Addn-CS130905 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: Rick O’Dell, Construction Inspector Engineering From: Frank Garza, Street Department Date: September 5, 2013 RE: Final Walk-thru Bellacere 9/5/13 1.Need to seal all joints going up the curb on all of street and alley. 2.Need to remove redwood on all joints that are on curbs, sidewalk and alley and seal them. 3.Need to rout cracks and seal them on street and alley. They are marked with paint. CITY OF COPPELL PUBLIC WORKS DEPARTMENT