NL Cypress-CS130827 Binkley& Barfield C&P
consulting engineers
L E T T E R O F T R A N S M I T T A L
To: George Marshall, PE, CFM Date: 8/27/13
City of Coppell
255 Parkway, P.O. Box 9478 BBI Project No: BC13062
Coppell, Texas 75019
From: Man Chan CC: Office File
Binkley& Barfield-C&P, Inc
1801 Gateway Blvd, Suite 101
Richardson, TX 75080
RE: Cypress Waters Lot 2 block H—Dividend Dr Tie In
We are sending you: ® Enclosed ❑ Under separate cover via
❑ Plans ❑ Copy of Letter El Change Order ❑ Right of Way Parcel
El Specifications El Shop Drawings ❑ Photographs El Right of Way Parcel
❑ Cost Estimate El CADD Files ® Other:
Item No. No. of Description
Copies
1 6 Construction Plans for Stamping
These are transmitted as checked below:
El As Requested El For Review& Comment El Returned with Corrections
El For Signature ® For Your Records El Returned for Corrections
REMARKS:
Signed: Man Chan
Binkley&Barfield-C&P,Inc. • TBPE F-3815 • 1801 Gateway Boulevard,Suite 101-Richardson,Texas 75080 • Tel:972.644.2800 I Fax:972.644.2817• www.bbcpi.com