DR1201-LR130830 (2) AUG-29-2013 23:42 P.02
Texas CMT, Inca
Construction Materials Testing GEE Consultants, Inc.
and Environmental Consulting
10044'Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com
•
REINFORCING STEEL PLACEMENT
Report Date: August 30,2013 Test Date: August 16,2013
Client: City of Coppell Report No.: 3
Project Creekview Drive Roadway Improvements Project No.: 213-0134
Identification Reinforcing Steel Observation
Method of Test Visual Observation Page 1 of 1
Results
On August 16,2013 reinforcing steel was observed at the following location:
Concrete beam for row#3 anchors :N.E.two-thirds(2/3)of the entire beam.
The following discrepancies were noted and called to the attention of a representative of ARK
Contracting Services: •
1) Limited locations where the beam was not 18 inches wide.
2) Four(4) locations where tie spacing was greater than 18 inches. '
The above discrepancies were corrected as noted prior to concreting on the same day.
Technician: RG
cc: Mr.Larry Davis-City of Coppell,Phone: 972-304-3684;via Fax:972-304-3570
Mr.George Marshall-City of Coppell,Phone:972-304-3562;via E-mail:gMarshall @coppelltx.gov
Mr.Rod Lacy-The Fain Group,Phone:817-927-4388;via E-mail:rlacy @faingp.com
Mr.Ernie Fields-Walter P. Moore,Phone:214-740-6251;via E-mail:efields @walterpmoore.com
Mr.Mark North-ARK Contracting,Phone: 817-478-7400;via E-mail:mnorth @arkcontractingservices.com
Texas CMT,Inc. TBPE Firm: F-4521 Reviewed by: --...
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive
our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
AUG-29-2013 23:42 P.03
Texas C , \ ! T, Inc.
AVAtt
Construction Materials Testing GEE Consultants, Inc.
and Environmental Consulting
10044'Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com
REINFORCING STEEL PLACEMENT
Report Date: August 30,2013 Test Date: August 16,2013
Client: City of Coppell Report No.: 4
Project Creekview Drive Roadway Improvements Project No.: 213-0134
Identification Reinforcing Steel Observation
Method of Test Visual Observation Page 1 of 1
Results
On August 16, 2013'reinforcing steel was observed at the following location:
Row#3 18" Beam : West One-third(1/3)of the Beam.
There were no discrepancies.
Technician: RG
cc: Mr.Larry Davis-City of Coppell,Phone:972-304-3684;via Fax:972-304-3570
Mr.George Marshall-City of Coppell,Phone:972-304-3562;via E-mail: gMarshall @coppelltx.gov
Mr.Rod Lacy-The Fain Group,Phone: 817-927-4388;via E-mail:rlacy @faingp.com
Mr.Ernie Fields-Walter P.Moore,Phone:214-740-6251;via E-mail:efields @walterpmoore.com
Mr.Mark North-ARK Contracting,Phone:817-478-7400;via E-mail:nmorth @arkcontractingservices.com
Texas CMT,Inc. TBPE Firm: F-4521
Reviewed by: i' "12Y
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive
our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
AUG-29-2013 23:42 P.04
Texas CMT, Inc.
,! -A
Construction Materials Testing GEE Consultants, Inc.
and Environmental Consulting
10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com
REINFORCING STEEL PLACEMENT
Report Date: August 30,2013 Test Date: August 29, 2013
Client: City of Coppell Report No.: 5
Project Creekview Drive Roadway Improvements Project No.: 213-0134
Identification Reinforcing Steel Observation
Method of Test Visual Observation Page 1 of 1
Results
On August 29, 2013 reinforcing steel was observed at the following location:
Row#5 Concrete Beam from North of Anchor 5A to 3' South of 5Y.
•
There were no discrepancies.
Technician: RG .
cc: Mr.Larry Davis-City of Coppell,Phone:972-304-3684;via Fax:972-304-3570
Mr.George Marshall-City of Coppell,Phone:972-304-3562;via E-mail:gMarshall @coppelltx.gov
Mr.Rod Lacy-The Fain Group,Phone: 817-927-4388;via E-mail:racy @faingp.com
Mr.Ernie Fields-Walter P.Moore,Phone:214-740-6251;via E-mail: efields @walterpmoore.com
Mr.Mark North-ARK Contracting,Phone: 817-478-7400;via E-mail:mnorth @arkcontractingservices.com
Texas CMT,Inc. TBPE Firm: F-4521 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive
our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.