Loading...
CF-Fire Station 3-LR 960924DEC-02-1996 11:11 CITY OF COPPELL ATEC Associates, Inc. ! 1356 M~this Avenue Dallas, Texas 75ZZ9 (972) 556-2204 MEI'RO ZG3-16gI Project: Client: _REPORT. OF CONCRETE CO[~PRES, SION TEST Coppell Fire Station No. 3 Date Sampled: 09/24/96 City of Coppell Our Report No: 25.02-96-00524.14A ~eld Test Data Location of Pour when Sampled: Pier #35, 36, 37 and 44 Contractor: Metro Custom Con. Sampled By; C. Delgado Time Batched: 11:24 Sampled: Temperature: Air: 74'F Concrete: Slump: 6.75 in, Air Content: 12:I5 93 °F Supplier/Plant: Pioneer/22 Delivery Ticket No.: 342208 Truck Number: 995 Load Size: 10 cu. yds. Mix ID No.: 9337 Water Added on site: 0 gals CompreSsive Stren__~h~ Test Results. I 47~ ~b l~l 7 I ,9~ 28.27 4,530 I 4708 Remarks: Cylinder diameter = 6.00 in. unless noted otherwise. R~spectfully submitted, This report rcpre, sentz only the materials tested and may °r/~-?~°t b~ ~ This report shall not bc reproduced except in its entirety an'fi'with the ¢: Inc. prescntative of idcntical or similar materials, ,press written permission of ATEC Associates, DEC-02-1996 11:12 CITY OF COPPELL P.08 ATEC Associates, Inc. ll$~6Mat~$Avenue DaUas, Texa~75ZZ9 Mt'I~O 265-1651 I~PORT OF PIeR INSPECTION PROJECT I~rFoRM 'lION Page 1 of 2 PROJECT: C~pe~ Fbe S~fioa ~3 ATEC ~OB NO.: 25-02-~524.14B CL~NT: Ciw of C~e~ GENE~ CONT~CTOR: Boyd A~C ~P~SENTAT~: C. Delgado PIER CO~CTOR: C~es DATE: Sep~mb~r 2~ 19~ CONC~TE S~PL~R: Pioneer I Ill I PIER I~WORMATION PIER DESIGNATION 35 31 37 44 PIER TYPE PI 1~1 PI PI PI DATI~ DRIt I.FD 9124196 012~/96 9/2~/~ 9/14~6 9/~196 DATE CONC~E P~CED 9~41~ 9/~/96 9/24/96 91~/96 9~4/96 SHA~ Di~R. IN. 18 18 BE~ D~METER. IN. -' -?- -- VER~CAL ~NFORCtNG S~EL 695 6~5 ~5 (NO., SIZE. L~G~) , (NO AND SPACING) I R~NFORC lNG STEEL LENGTH 21.6 2i 2 21 9 22.0 ~.0 LENGTH OF CASING, ~. 20.0 26.0 ~ 0 ~.0 ~.0 GROUND 5U~ACE EL~ATION. ~. 99,6 9~.6 ~.6 99.6 ~.6 DE~ TO B~RING S~TA, ~. 1%2 17,5 17.5 D~IGN PEN~ON, ~. 7.0 ~.0 7.0 7,0 7.0 TOTAl, PIeR O~, ~. 24.3 2~.6 24.7 24,S 25.5 BOSOM OF PIER E~VATION. ~. 75 3 T~-0 74-9 J 74'8 74. ] TOP OP m~R S[~WT~ON ~-0 9~.0 ~0 Respectfully Submitted, DEC-0~-1996 11:12 CITY OF COPPELL P.09 ATEC Associates, Inc. ll$5~Matl'fis Avenue D~Has, Texas (972) $56-2204 METRO 263-1681 REPORT OF pI :R INSPECTION I III I PROfSCT: CLIENT: ATEC REPRESENTATIVE: DATE: Coppell Fi.re Stilton #3 City of CoppelI C. Delgado September 24, 1996 PROJECT INFO~ATION ATE~ JOB NO.; GENERAL CONTRACTOR: PIER CONTRACTOR; CONC~RETE SUPPLIER: PIER DESIGNATION 42 43 PI F..R TYPI] PI P DATE DRILLED 9/2t,/96 912,~19~ DAT~ CONC~ F~C~ 9~4/~ 9~4/~ SHA~ DiAM~ER. ~RTICAL ~INFORCING STE~L ~O,, SIZ~ L~NGTH) (N0. AND SPA~NG) , ~]NPORC ~G S~L ~NGTH L~GTH OF CASING. ~. 20.0 ~0.0 GROUND SUMAC5 ~L~VXT[ON. ~. 99.6 ~.6 D~IGN PENE~TION, A~UAL PENET~TION, TOTAL P~R DE~H. BOSOM OF PiER ~! ~VATION, TOP OF P[~ ~L~VATION Remark: Page 2 of 2 25-02-96-00524. I4C Boyd Construction Charlies Pioneer I Respectfully Submitted, TOTAL P.09