Signature-CS130910 T H E • C 1 T Y • O F
COPPELL
September 10, 2013
Jim Swartz
Resource Commercial,Inc.
5323 Spring Valley Rd,#300
Dallas TX 75254
RE: Signature Living at Denton Creek(River Oaks Assisted Living)
Final Acceptance Pending
Dear Mr. Swartz:
Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for
the referenced project. One item remains in order for Final Acceptance to be issued by the
Engineering Dept.
• Provide maintenance bond(s) guaranteeing workmanship in the amount of 50% of the
contract price for work performed in right-of-way / easements (utilities, paving, and
drainage) for a period of two years. Back-up documentation showing quantities of the work
covered should be included with the bond(s). Maturity on the bond(s) will be two years
from the date of the Final Acceptance letter.
When these documents have been received and approved, a letter of Final Acceptance will be
issued for the project. Thank you for your prompt attention to this matter.
Sincerely,
taam
Rick O'Dell
Construction Inspector
Office Phone: (972) 304-7090
Fax: (972) 304-3570
Enclosures