Loading...
Signature-CS130910 T H E • C 1 T Y • O F COPPELL September 10, 2013 Jim Swartz Resource Commercial,Inc. 5323 Spring Valley Rd,#300 Dallas TX 75254 RE: Signature Living at Denton Creek(River Oaks Assisted Living) Final Acceptance Pending Dear Mr. Swartz: Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the referenced project. One item remains in order for Final Acceptance to be issued by the Engineering Dept. • Provide maintenance bond(s) guaranteeing workmanship in the amount of 50% of the contract price for work performed in right-of-way / easements (utilities, paving, and drainage) for a period of two years. Back-up documentation showing quantities of the work covered should be included with the bond(s). Maturity on the bond(s) will be two years from the date of the Final Acceptance letter. When these documents have been received and approved, a letter of Final Acceptance will be issued for the project. Thank you for your prompt attention to this matter. Sincerely, taam Rick O'Dell Construction Inspector Office Phone: (972) 304-7090 Fax: (972) 304-3570 Enclosures cc: Michael Garza, P.E., Civil Engineer 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673