Loading...
CF-Fire Station 1-CS 960501To: Ted Dutt, Interim Utilities Superintendent Street Department, Per Birdsall Clay Phillips, Fire Chief Jeff Jones, Fire Marshal Greg Jone.s, Chief Building Official From: La'traction Inspector RE: WALK-THRU for Fire Station #1 / 520 Southwest Blvd. Date: May 1, 1996 A walk-thru for paving and utilities for the referenced project has been scheduled for Monday, May 6, 1996 at 8:30 a.m. If I can be of further assistance please let me know. file/ldavis/Owalkthru.mm COPPELL ENGINEERING UTILITIES DIVISION MEMORANDUM DATE: May 6, 1996 TO: Larry Davis, Construction lngpector FROM: Matt Cast, Superintendent of Public Services RE: Walk thru for Fire Station # 1 (520 S0othw~stem) A walk-thru on the above referenced project was conducted on 5/6/96 and the items below were found to be deficient. 1. Put UP fence to elevated tank, M0ke sure lights are inside fence. 2. Irrigation meter ~d check valv~ needs to be moved out of concrete as plans designate. Clean out both boxes below fittings. 3. Domestic meter and double 9heek needs to be moved out of concrete as plans designate. Clean out both boxes and need tO see bypass line. 4. Fire hydrant valve needs to be put in a valve stack and brought to ground level. 5. Loegt¢ main line valve between admit building and new Fire Station building. 6. Locate sewer clean out. Please ensure that these items get taken care of and if you have any questions, please give me a call. MC/dg MBMORA~U)i TOz ~m~ DavLBs Construction Xnspeo~o~ fROM: ~e~ D~rdse~, 8~gn S~gnm~ RB~ Walk Thru £or Fire Stat£on ~1/520 Southwest Blvd. A walk through was conducted at the above re£erenced location today. The followin~ de£iciencies were identi£ied; 1. West Approach -- Remove sealer, clean Joints, replace With silicon type sealer. Rout and seal random crack in approach. Needs curb ear at redwood header on approao~ both sides. Saw and seal curb returns on both sides of drive. 2. East drive way same as above ~1. 3. Repair spall to existing pavement west side of approach. 4. Needs curb ear at redwood header on approach west side only. 5. Seal curb returns. 6. Repair spall to curb west side. 7. Clean up street and drop inlet. PB/bc COPPELL C~ii',;~ ~USTiCE CENTER CONTRACTOR DIRECTORY CONTRACTOR MID-SOUTH CONTRACTORS OF TEXAS, INC. 214-828-0309 OFFICE 6162 E. MOCKINGBIRD SUITE 210 214-828-0347 FAX DALLAS, TX 75214 JOB SITE ( DATBt M~y ~; 1996 rRo~z ~er Bi~ds&~, 8~9n Oigna~ RB~ Walk Thru for Fire Station #1/520 Southwest Blvd. A walk through was conducted at the above referenced location today. The following deficiencies were identified: 1. west Approach -- Remove sealer, olean Joints, replace with silicon type sealer. Rout and seal random crack in approach. Needs curb ear at redwood header on approach both sideB. Saw and seal curb returns on both sides of drive. 2. East drive way same as above #1. Repair spell to exietin9 pavement west side of approach. 4. Needs curb ear at redwood header on approach west side only. 5. Seal curb returns. Repair spell to curb west side. 7. Clean up street and drop inlet. PB/bc