Loading...
Sherrill L3-CS130911 T H E C I T Y O F COPPELL September 11, 2013 Chris Seely, P.E. Ridinger Associates, Inc. 550 S. Edmonds Lane, Suite 101 Lewisville, Tx 75067 RE: Sherrill Acres Lot 3 Block 1 Construction Plan Review Comments The City of Coppell has reviewed the referenced plans and has the following comments to offer Utilities - 1. Place the FDC closer to the fire hydrant if possible. 2. Place the other fire hydrant near the vault outside of the easement. The City of Coppell has reviewed the plans for the referenced addition which will be approved with the comments above addressed. The City of Coppell requires three sets of final construction plans for its use; your office should submit as many additional sets for stamping as is necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved by the City of Coppell along with a copy of the City's standard construction details. All fees must be paid prior to release of this project for construction. The City charges a 2% inspection fee for all private construction outside the building's footprint. This includes dirt work, paving, storm drains, water lines, sewer lines, drainage pipes, etc. that are private. For all installations in the public right-of-way or easement, the City charges a 4% fee. A check for inspection fees made to the City of Coppell should be submitted to this office along with the Construction Development Permit Application and a copy of the Construction Site Notice. For your convenience a spreadsheet is attached to the permit application for use in calculating the inspection fees. A copy of the contract(s) should be attached for verification purposes. If you have any questions, please contact me at your convenience. Sincerel Pâ–șIIJ Mich.e za, P.E. Civil Engineer Office Phone: (972) 304-7019 mgarza @coppelltx.gov 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673