Loading...
Gateway BP(3.2)-CS130911 mum F-114L.1.FF 12225 Greenville Avenue,Ste. 200 ■ • Dallax74(214)572-2272 Fax(214)572-2273 LETTER OF TRANSMITTAL To: Mike Garza, P.E. Date: September 11, 2013 City of Coppell Engineering Department 265 Parkway Blvd. Coppell, Texas 75019 From: Ben Stephens, P.E. AVO: 25322 Freeport Corporate Email: bstephens(a�halff.com Center Building 7 Gta rt uhv.A y g(.4_S l < , £-o T 3 G `R 1.5‘-.14 Z, WE ARE SENDING YOU Attached ❑ Under separate cover via_ the following: ❑ Shop Drawings ❑ Prints ® Plans ❑ Drawings ❑ Specifications ❑ Copy of letter ❑ Report(s) ❑ CD/DVD ❑ Other: VIA: ['Hand Delivery ❑US Postal Service Courier ❑Overnight Express THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approval as submitted ❑ Resubmit_copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ® For review/comment ❑ Other: ITEMS SENT: • 9 full-size sets of Engineering Plans for Freeport Corporate Center Building 7 (Gateway Business Park, Block 2, Lot 3C-R), for City Engineering Department approval stamp • 1 copy of Engineering comments dated July 18, 2013 COMMENTS: In accordance with our email correspondence since the Engineering review in July, the version of the Freeport Corporate Center Building 7 engineering plans submitted herewith incorporate miscellaneous minor revisions, including a revision to the proposed overhead/electric lines, which was the subject of the only comment in the July 18, 2013 response. As directed, 3 sets are included for the City's use. The remaining 6 sets are for the contractor's and engineer's use. Please let me know if you have any que .e or need additional information or copies. Thank you, SIGNED: a' COPIES: ® File ❑ Owner ❑ Contractor ❑ Other: