Loading...
MA1009-LR130913 In-Place Soil Moisture/Density Tests by Nuclear Method 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client:Report Distribution:(90) kmarvin@coppelltx.gov City of Coppell (90) steve@jdkassoc.com Project: Erosion Control for Andy Brown (90) kdykes@tnpinc.com Park and Alex Drive Canal (90) asamaniego@coppelltx.gov Project No. MA10-09 (90) radloo@coppelltx.gov (90) jelias@coppelltx.gov 687-13149-006 CMJ Report No.: 09/13/2013 Report Date: SpecificationsTest Data Percent Compaction:+95% minDate Tested:09/05/2013 Moisture Content:opt +0% to +5%Technician:Randy Boots Material Reference Curve Data OptimumMaximum Dry Curve No.Test MethodMaterial DescriptionMoisture %Density pcf B045Brown & Tan Sandy Clay 19.5102.0ASTM D-698 B107Tan Brown Clayey Sand 11.0112.5ASTM D-698 In-Place Test Results TestElevationRef.ProbePercentWet DensityDry DensityPercent NoLocationor LiftCurveDepthMoisture(pcf)(pcf)Density Wall Backfill ** 98.0 4.0100' South of Bridge19.8100.02nd LiftB0456"119.8 96.8 5.0200' South of Bridge21.198.72nd LiftB0456"119.5 97.8 6.0300' South of Bridge11.0110.01st LiftB1076"122.1 98.9 7.0400' South of Bridge12.1111.31st LIftB1076"124.8 Test results on this report meet project specification. Test Method(s): ASTM D6938 Comments: ** Wall Backfill, East Wall South of Parkway Blvd. Bridge Humboldt46742898481 Gauge:Gauge SN:Std. Density Count:Std. Moisture Count: Digitally signed by R. Carl Lee R. Carl Lee DN: cn=R. Carl Lee, o=CMJ Engineering, Inc., ou=CMT Department, email=clee@cmjengr.com, c=US Date: 2013.09.13 09:43:18 -05'00' CMJ Engineering, Inc R. Carl Lee, S.E.T. Vice President/CMT Manager LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. Page 1 of 1 07