1st United-CS130917 T H E C 1 T Y O F
COPPELL
W . .4
F
A S ,
September 17, 2013
Bryan Burger, P.E.
Burger Engineering
17103 Preston Rd. Suite 180N
Dallas TX 75248
RE: First United Methodist Church Lot 1R Block 1
Construction Plan Review Comments
The City of Coppell has reviewed the referenced plans and has the following comments to offer:
Water Plan-
1. Place the 4" FDC adjacent to the fire hydrant.
The City of Coppell has reviewed the plans for the referenced addition which will be approved with the
comments above addressed.
The City of Coppell requires three sets of final construction plans for its use; your office should submit as
many additional sets for stamping as is necessary for construction operations. All contractors and
subcontractors onsite must have a copy of the plans approved by the City of Coppell along with a copy of
the City's standard construction details.
All fees must be paid prior to release of this project for construction. The City charges a 2% inspection
fee for all private construction outside the building's footprint. This includes dirt work, paving, storm
drains, water lines, sewer lines, drainage pipes, etc. that are private. For all installations in the public
right-of-way or easement, the City charges a 4% fee. A check for inspection fees made to the City of
Coppell should be submitted to this office along with the Construction Development Permit Application
and a copy of the Construction Site Notice. For your convenience a spreadsheet is attached to the permit
application for use in calculating the inspection fees. A copy of the contract(s) should be attached for
verification purposes.
If you have any questions,please contact me at your convenience.
Sincer-,. ,
,.err_
Mid ad; arza, P.E.
Civil Engineer
Office Phone: (972) 304-7019
Fax: (972)304-3570
mgarza a coppelltx.gov
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673