Loading...
1st United-CS130917 T H E C 1 T Y O F COPPELL W . .4 F A S , September 17, 2013 Bryan Burger, P.E. Burger Engineering 17103 Preston Rd. Suite 180N Dallas TX 75248 RE: First United Methodist Church Lot 1R Block 1 Construction Plan Review Comments The City of Coppell has reviewed the referenced plans and has the following comments to offer: Water Plan- 1. Place the 4" FDC adjacent to the fire hydrant. The City of Coppell has reviewed the plans for the referenced addition which will be approved with the comments above addressed. The City of Coppell requires three sets of final construction plans for its use; your office should submit as many additional sets for stamping as is necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved by the City of Coppell along with a copy of the City's standard construction details. All fees must be paid prior to release of this project for construction. The City charges a 2% inspection fee for all private construction outside the building's footprint. This includes dirt work, paving, storm drains, water lines, sewer lines, drainage pipes, etc. that are private. For all installations in the public right-of-way or easement, the City charges a 4% fee. A check for inspection fees made to the City of Coppell should be submitted to this office along with the Construction Development Permit Application and a copy of the Construction Site Notice. For your convenience a spreadsheet is attached to the permit application for use in calculating the inspection fees. A copy of the contract(s) should be attached for verification purposes. If you have any questions,please contact me at your convenience. Sincer-,. , ,.err_ Mid ad; arza, P.E. Civil Engineer Office Phone: (972) 304-7019 Fax: (972)304-3570 mgarza a coppelltx.gov 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673