Loading...
CF-TownC CHC-PL-860718COPPELL TOWN HALL PUNCH LIST II PROJECT NO. 8457 JULY 18, 1986 In numerous instances especially at the upper radius the caulking has already begun to detriorate and 1 to 1 1/2" gaps are present. At the limestone sills under the window units at the second floor the underside edge at the drip edge needs to be cleaned of excess mortar. As a typical note there are numerous cracks visible in the wood cornice area. The General Contractor also needs to insure that the backside of all wood cornice material has been properly primed. Refer to previous field reports which indicate that on both the north and west sides of the building the backsides of the wood cornice were not primed prior to installation. The limestone columns still have strong color variations between the pieces. This was previously discussed with the General Contractor. These columns also need to be cleaned thoroughly to remove any stains which occurred during their storage on the job site and during transit to the job site. The wood storefront in this area has only been prime painted but prior to receiving final painting numerous areas need to be caulked especially the joint between the brick and wood storefront and also all dings~ nicks~ chips~ etc. need to be repaired and this entire unit needs to be sanded. This is a typical note for both sides of the building and also refers to the panelized window above each main entry. The construction on these wooden units is not of good quality and much remedial work will be required to make these acceptable. Clean all limestone colurms and bases and all limestone in general. At the main entry area the concrete stairs shows that they have been chipped~ nicked and patched in numerous areas. Refer to previous field reports of some eight months ago when the General Contractor was advised that these concrete steps in the main landing in front of the building should be protected and not used as a storage area for steel products. It is requested that the Owner review this installation as to its acceptability. The General Contractor has much remedial work to make this item acceptable. At the wood cornice area all inside and outside corner joints need to be caulked and any damage or split wood needs to be removed and replaced.. At the main entry area install graphics once they arrive on site. During the cleaning of all limestone insure that the joints between limestone pieces are thoroughly cleaned and also any mortar which has smeared over on the face of limestone pieces is thoroughly cleaned or this will cause a very spotty appearance during the weathering process. At the main entry area west end approximately 16' above finish floor the mortar joint color appears to be inconsistent and needs to be redone. The General Contractor needs to insure that when pointing up the brick joints that the color of mortar matches the surrounding mortar joints in color. WEST SIDE OF THE BUILDING All notes on the north side of the building appear valid for this area. Also especially the splotchiness in the roofing-color, the cleaning of all limestone, pointing up of all brick and the caulking items. At the joint between the sidewalk and brick wall and/or limestone sills insure that the form lumber w.hich has been used is recessed and that this joint is caulked. Also at the ends of each sill the concrete and wood which is exposed needs to be removed and a smoothed concrete surface needs to be installed in this 3 x 3 void area. At exterior door No. 6 the threshold is approximately 3" above the exterior sidewalk. This is not in compliance with the handicapped code and the General Contractor is requested to review the value engineering notes which call for a ramp near this area. 4. There are still numerous areas where the wood cornice appears to have split, especially near the interior and exterior corners. 5. As a typical note, this elevation also has problems with the metal flashing at the roof line which needs to be corrected by the General Contractor. 6. Reprime and paint Door No. 6 along with steel brick shelf above this door location. The General Contractor should refer to Detail 1.103 which is a typical detail of how to treat the wood or fiberous joints which are located within the sidewalk or at the sidewalk building joint. This typically has not been done around the building. SOUTH ELEVATION 1. All general notes from the north side of the building apply. Z. Check trim rings on light fixtures over the main entry doors. The sidewalk area and stair area immediatley outside the main entry on the south side of the building needs much remedial work with regard to the concrete and the slab needs to be thoroughly cleaned. The General Contractor should refer to Detail 1.103 with regard to the expansion joint treatment and sidewalk area. 5. Numerous areas of caulking around these wooden units will be needed prior to final acceptance. The metal flashing at the roof area is very wavy and particularly over the main entry area a large gap exists between the wood and metal flashing. The metal flashing and head cornice work above the main entry on the south side of the building is not acceptable. The IBP roofing work on the south side of the building is extremely blotchy and as stated earlier the General Contractor has been previously advised of this and remedial action will be required. Also the ridge tiles do not extend far enough over the edge at the outside corners to protect this work. There appears to be much remedial work required to make the roofing and metal flashing acceptable. 8. Repair or replace all damaged or stained limestone. The ridge tiles of the IBP roof should align with the outside corners of' the wood cornice and metal roof flashing and should not be offset as seen during this inspeciton up to 3". 10. Insure that all exterior doors have been painted. 11. Clean all granite surfaces (see page 3 ~14) 1Z. At the wood cornice work the joints are very pronounced between assembly pieces. Remedial work will need to be accomplished to make these acceptable. 13. At door No. 3 install strike plate. At Door 13 adjustment is needed to threshold and strikeplate. At Door 13 install strikeplate and adjust threshold. 14. 15. 16. There is still much remedial work that needs to be done. With regard to the metal flashings at the roof area especially the metal flashings exposed near the wood cornice area. The limestone columns at the south face of the building need to be cleaned to remove all staining which had occurred during storage of these materials and also there is a pronounced color difference in the sections of columns which was previously discussed with the General Contractor prior to installation. The General Contractor has rubbed and patched the exposed grade beam at the ramp area located east of the south entry area and already it is showing signs of cracking and separation. The General Contractor needs to redo this work. 17. The housing for the generator has been scratched in numerous areas and rusting has occurred. This entire unit needs to be repainted. EAST SIDE OF THE BUILDING i. All notes from the north, south and west elevations apply. Z. Remove tar and drywall splatter from the brick surfaces. Set flush the cleanout which is set in the concrete paving immediately outside of Door 10 and also the cleanout between Doors 10 and 9. Clean all limestone. Properly treat joint between concrete paving and brick along east elevation. The height of the thresholds at both Doors 9 and 10 exceeds the Code requirements. There are numerous areas where the limestone is damaged or chipped and remedial work needs to be accomplished. This is a typical note around the entire project and the General Contractor needs to address this as quickly as possible. 4 8. There is a gap that exists between the IBP roofing shingles and the top edge of the metal flashing at this elevation which needs to be repaired. 9. The IBP roofing system has a splotchy appearance. 10. There are tar stains on the IBP roofing system which are visible from this elevation. 11. There appears to be the same flashing problems on this elevation as we have had around the north, south and west elevations. 1Z. It appears that some of the:IBP shingles are not installed properly and are standing up on edge. This needs to be checked by the roofing subcontractor. There are also numerous tiles which are damaged by tar in this area. SITE WORK 1. Check spacing on stripes. INTERIOR PUNCH LIST MECHANICAL ROOM AT PENTHOUSE 1. A thorough cleanup of this area is required. Z. Along the west wall at the compete curb this area needs to be rubbed to eliminate the honeycombing. 3. All over spray and dirt needs to be removed from the mechanical equipment. 4. Seal all penetrations through gypsum drywall. 5. Seal joint between drTwall and concrete deck or exposed steel angle. 6. Install door between mechanical room and stairway. 7. A complete mechanical/electrical/plumbing punch list for this area will be prepared by James Johnston & Associates and furnished at a later date. STAIRWAY A 1. At ~che penthouse levetthe lowest intermediate railing enclosure is not within code tolerance. The distant center line between intermediate rails is to be no more than 6". The distance between the finish floor and lowest intermediate rail is 1Z". Check code requirement. A thorough cleanup of this area is required. 3. Seal joint between drywall and other metal stringers or concrete deck at landings, typically. 4. At the up stairwell from the second floor to penthouse a gap exists between the metal landing and first riser which needs to be welded shut. 5. Replace damaged light fixture lens. ROOM Z31 - LIBRARY DIRECTOR 1. A thorough cleanup of this space is required. Z. Rebed and repaint outside corner near entry door. 3. Replace damaged ceiling tile at sprinkler head and adjacent to ceiling lights. LIBRARY - -Z29 1. Replace damaged ceiling tile. Z. Replace stained ceiling tile. 3. The gypsum drywall enclosure around the window units typically needs to be reworked and in some instances cracking has already begun and water infiltration is present. 4. Set all sprinkler heads flush with ceiling tile. 5. Remove all paint and glue stains from carpeting. 5. Approximatley 5' east of Column E9 there is an apparent water leak which has shown up in the ceiling tile. 7. As a general note the sprinkler subcontractor needs to submit to the City prior to release of retainage the approved set of sprinkler plans as stamped by the State Board of Insurance. 8. Reset glazing gaskets in all window units. COMPUTER-ROOM Z38 1. The floor tile on this room shows extensive scratches which have occurred and it may be prudent to replace the tile in this room. Z. At Door 118 rework door head and provide filler pieces at corners of jambs to seal opening. 3. The installation of vinyl base at the southwest corner is incorrect. MECHANICAL ROOM - Z37 1. Seal all penetrations through drywall. Z. Seal all unused penetrations through concrete floor slab. Insure that the fallback insulation is properly installed under roof structure. There are numerous areas where the metal-decking is exposed to view and this needs to be sealed off. 4. James Johnston, the mechanical engineer for the project will visit the site and prepare a complete punch list on this room - this will be provided at a later date. WORKROOM - Z36 1. Set sprinkler heads flush with ceiling tile. MULTI-PURPOSE ROOM - ZZ8 1. Complete the installation of doors into storage room ZZ7, Door 106 - - used for change order. Z. Align Raco trim track with head track so no offset joints exist. 3. Touch up painting is required on almost every wall in this room. 4. There is a bulge in the wall at the vinyl base area located near Door ~06. STORAGE ROOM - ZZ7 1. Level ceiling. Z. Clean all paint and glue from concrete floor slab - needs tile. 3. At the northeast corner of room the concrete floor slab has cracked and it appears that remedial work will be required to repair this area. · AREA IMMEDIATELY ADJACENT TO ROOM 217 TO THE EAST 1. Rework ceiling grid to eliminate gaps between main tee joints. PERSONNEL OFFICE 1. The carpet at the southeast corner is stained. Z. Complete the installation of the Raco door and window system along the south wall. Waiting on material - August. 3. Re,place damaged ceiling tile. CONFERENCE ROOM - Zll 1. Rework drywall above head of doors typically. Z. Align ceiling grid. WORKROOM - Z13 1. This room cannot be punched at this time as work is in progress. COPY STORAGE - 1. This room cannot be punched at this time since work is in progress. STAFF ROOM - Z10 1. Replace damaged ceiling tile. Z. Set sprinkler heads flush with ceiling tile. ROOM Z07 1. Set sprinkler head covers flush with ceiling tile. Z. Relevel ceiling grid and replace bowed and defective tile. 3. Look at glass along ssouth wall -- appears to be defective. There are numerous pinholes and scratches. This glass will need to be replaced and this is a typical note. 4. Typical note, a separate punch list will be prepared for the condition of the glazing. It is quite noticeable in this room that there are numerous panes of glass which will need to be replaced. CITY MANAGER'S OFFICE - 201 1. Rework joint between Raco top track and ceiling grid at east and west walls. Z, Rework ceiling grid entirely in this room to eliminate gapping between grid pieces. 3. Replace damaged ceiling tile. e From this room looking to the north at the railing area where the railing terminates into the drywall column typically, these need to be reworked and are presently unacceptable. 5. The joints at the sill of the Raco system along the north wall behind Door 81 have gotten very wide and are unacceptable. OFFICE AREA IMMEDIATLEY WEST OF THE CITY MANAGER'S OFFICE 1. Z. Align Raco top track along east wall. Rework joint between gypsum drywall ceiling between columns and ceiling grid to create a smooth transition. 3. This area typically needs to be repainted with regard to the gypsum drywall, 4. Align ceiling grid. 5. Rework carpet at base and complete the installation of vinyl base at the northeast corner of room near decorative column. VAULT AREA - 205 1. Remove excess glue from concrete floor and seal as required. Z, Install entry door to this room - change order. 3. All walls need to be repainted due to numerous stains and gouges. CENTRAL FILING - 209 1. Replace damaged ceiling tile. Z. Set sprinkler heads flush with ceiling tile. Rework ceiling grid so it is level and the main tees are aligned. Rework'joint between perimeter suspended acoustical ceiling grid and gypsum drywall ceiling between columns to create a flush appearance. The joint which is present now is totally unacceptable and is out of line. Much rework will be required to make this an acceptable installation especially since the General C~ntractor has gone ahead and doubled up on the perimeter angle thus making this mistake very noticeable. There are numerous stains in the carpet especially outside of the conference room near Door 89. 6. The typical carpet problems exist with regard to gaps being apparent between the carpet and vinyl base at walls. 7. Remove paint from all door hardware - this is a typical note. 8. Rework drywall at Raco top track trim. There are problems with this particularly over Door 99. It appears that the perimeter ceiling grid is not level and gapping as much as 1/4" to 3/8" as present. This may also be a problem caused by warping ceiling tile and this needs to be verified with the General Contractor. 10. Set all sprinkler heads flush with ceiling. 11. The carpeting needs to be reworked near the northeast corner of this room. It is apparent that it is installed incorrectly and some bagging has occurred in its installation. 12. The seams in the carpet joints need to be reworked to make them acceptable. 13. Look at doors - the entry doors to this area located at the northeast corner of the room may need to be replaced due to the numerous scratches, chips and dings and for sure they need to be repainted. CORRIDOR - ZZ4 1. Repaint all walls. Z. Properly trim out around water cooler. At the cased opening between the lobby and this corridor prepare door frame and rebuild as required. The door frame has numerous gouges and at the mitered corners they do not lay flush and flat. Also at the head condition the wood used for the head of the door has been cracked and should be replaced. VESTIBULE - 223 1. Check trim rings - set downlight trim rings flush with ceiling. JANITOR'S AREA - 225 1. The drain piping for the Janitor's sink has begun rusting. WOMEN'S RESTROOM - Plastic vanity countertop is loose and is not properly supported at west wall. This wall will need to be taken apart and the proper steel supports added to secure this in position. Properly trim out around parabolic light diffuser at ceiling above mirror. The vinyl wallcovering installation needs much repair especially at joint conditions. At vinyl wallcovering on patterned wall the pattern between joints does not align and needs to be redone. 4. Flush up all sprinkler heads with ceiling. 5. Repair drywall aro~d downlights. Under the vanity area complete the installation of wallcovering. 7. The General Contractor should verify that the mOunting location of the paper towel dispenser meets the handicapped code and is as shown in the plans. 8. Check the metal toilet partitions - shows numerous scratches which need to be repaired especially in the handicapped stall. 9. Check handicapped code. MEN'S RESTROOM - ZZZ I. On the east wall the paper towel dispenser is set approximately 10" too high. Z. Properly trim out around parabolic light trough.at west wall. 3. Repair drywall and flush up downlight trim rings. 4. Check the installation of wallcovering under vanity. 5. Check handicapped code. 6. Check all toilet partitions -- need to be cleaned up and repaired as necessary. There are numerous scratches which need to be taken care of. 10 LOBBY AREA - ZZ6 1. Check at the northeast corner of this area and northwest corner of this area -- appears there is roll in the floor which needs to be floated out. Z. Will repaint dings, chips and split wood pieces in wood used to case opening into Corridor ZZ4. Much remedial work will need to be done. 3. Plush up all sprinkler heads with ceiling tile. 4. Complete the installation of light fixtures to eliminate the painting. The decorative wood trim around all doors needs much rework especially at the mitered joints and/or edges at the door casing around Door 99, north side. This style needs to be replaced as it was milled incorrectly. 6. Repaint door and frame for elevator. 7. It appears that there is a roll in the ceiling directly above the grand stair to the west side. At the gypsum drywall sill there is a bow which is very noticeable the end conditions in- dicate an 8" height above finish floor yet in some instances more toward the center of this window unit this dimension gets down to 7" and is very noticeable. FINANCE DEPARTMENT 1. The vinyl base installation has numerous gaps between the joints of the vinyl. Z. There are marks and stains on the wall which.need to be touched up. 3. Rework joint between drywall return and aluminum window frame. 4. Rework drywall around door frame. 5. Rework door frame to eliminate gouges, and nicks and also.rework 45° miters. 6. Repair d-"-fwall around all door. openings. 7. A thorough cleanup of this item is required.., VAULT- 1Z6 1. Install entry door- change order. Z. Repair defects in gypsum drywall and repaint around door frame. 3. Clean vinyl floor tile which has been stained. 4. Snug up the sprinkler head cover to the ceiling. 11 CORRIDOR - 119 1. The touchup painting which has been accomplished in this corridor is unacceptable because the touchup paint used is significantly lighter than the balance of the wall. It appears that the corridor will need to be repainted in its entirity. A thorough cleaning of this space and all door frames and doors will be required. At the southeast corner the drywall needs to be reworked and this area repainted. The joint between the suspended acoustical ceiling and the drywall soffit between columns is unacceptable and needs to be redone. LOBBY AREA - 10Z 1. The terrazzo floor needs to be buffed prior to final acceptance by Owner. The carpet joint between the carpeting and the terrazzo floor is unacceptable. It is very rough and wavy and there is differences in the elevations which causes a stumbling block which could be potentially dangerous. Basically the carpeting on the first floor area, the installation to date is unacceptable especially around the terrazzo. There is variation in the terrazzo floor darker colors and it appears that in some instances near the column locations the terrazzo is not ground down sufficiently or it was a problem with the mix which has created some very visible light spots. Also at the corner joint adjacent to the stairs it appears that the terrazzo subcontractor did not futty carry his screeds to a termination point, thus allowing for a ragged corner at the north- east corner of the light terrazzo area. 3. From the main lobby area you can see numerous ballisters which are split and need remedial action. OUTSIDE OF THE FINANCE DEPARTMENT 1. The location of the downlights is not centered in the soffit as required. Z. Rework all woodwork as the splicing in the woodwork is very visible. Look at. 1Z FINANCE DIRECTOR'S OFFICE- 117 1. The Raco trim track along the south wall is marred in numerous areas & needs to be repaired. Also all joints need to be abutted tightly together. Z. All sprinkler heads need to be flushed with ceiling. PROGRAMMER- 116 1. Clean all paint from electrical outlets. Z. Complete the installation of sprinkler head trim plates. 3. Replace the two pieces of window glass in the west window unit due to scratches and numerous pinholes in the tinted coating surface. 4. Replace window glass in the northeast window unit due to scratches. 5. Replace window glass in northwest unit because of poor film coating. list will be prepared on all glazing separately. A final punch NORTH AP~EA OF COMPUTER ROOM - 115 1. Properly install vinyl base so no waves exist. Z. Replace damaged glazing in this window unit. 3. Remove paint from vinyl base. SOUTH PORTION OF COMPUTER ROOM - 115 1. There are numerous marks on drywall around vinyl base. Z. Look at vinyl floor tile in this area -- has been scratched in numerous areas and it appears that some removal may be necessary to make this space acceptable. CORRIDOR- 111 1. All walls in this corridor need To be repainted to make them acceptable as there are numerous scuffs and abrasions to the surface. ELECTRICAL ROOM - llZ 1. Seal all penetrations through drywall. Z. Clean aH electrical panels and repaint galvanized boxes. B. Tape, bed and paint behind transformer location. Check with Fire Marshall to cap off head - verify sprinkler head location in this room and set sprinkler head flush with ceiling. AV CONTROL ROOM - 1Z3 1. Seal joint between countertop and wall. Z. Rework fun* out around dimmer controls. This was to have been done with a metal box which was to have been vented on all sides. Check vents for heat. 3. Check the bounce in the wood flooring in this area. CONFERENCE ROOM - 108 1. Threshold at Door 29 is incorrect - will be replaced. Z. Rework threshold at double exit doors - will be weatherstripped - check later. KITCHEN- 109 1. Rework drywall ceiling around light fixtures. Z. Provide proper assembly fo~_ damper control near east end of room. COUNCIL CHAMBER - 107 1. Clean stains from carpet. Z. Will re-tighten projection screen on southeast wall at end of job. MECHANICAL ROOM - 104 1. Remove rebar from floor slab which is penetrating near drain lines. TELEPHONE ELECTRIC ROO}.{ !. Seal all penetrations through drywall. Z. Provide access door at ceiling to enclose damper switch. 3. Separate punch list will be s--~pplied later by James Johnston & Associates ROOM-- 137 1. Complete the installation of sprinkler head. CORRIDOR - 135 1. Replace damaged ceiling grid. 13 14 POLICE ADMINISTRATION ROOM - 139 1. Touchup painting that has been accomplished is unacceptable. Z. Clean and seal all floor tile. 3. Install door to what used to be vault area - change order. 4. Above entry door 54 rework Raco track, enclose all gaps in the top track assembly. CRIMINAL INVESTIGATION DEPARTMENT- 141 1. Remove stains from carpet. CHIEF'S OFFICE - 143 1. Clean top track of Raco system in closet. ' Z. Flush tight to wall the trim track at top of wall and ceiling joint. MEN'S LOCKER ROOM - 177 1. A thorough cleaning of this area is required. Z. Clean all lockers. 3. All lockers have been scratched and will need to be repainted to make them acceptable. MECHANICAL ROOM - 178 1. The gypsum drywall adjacent to the main entry door is severely damaged & this drywall needs to be removed and replaced. POLICE LOBBY AREA - 140 1. Clean all stains from carpet. Z. Above ceiling the insulation around pipes has been removed especially for condensate 'drain lines and this needs to be repaired. 3. Set all sprinkler heads flush with ceiling tile. 4. Repaint walls as required. 5. Replace damaged ceiling grid and align all ceiling grid. 6. Seal gap and properly level over Door area 5Z. PHONE AREA - 130 15 1. Public telephones to be installed by telephone co. Z. Rework drywall around base and around wooden door frame and repaint. 3. The splicing of casing trim at face of doorframe is unacceptable. ELEVATOR EQUIPMENT ROOM - 1Z8 1. Seal all penetrations through drywall. Z. Check - properly secure equipment to floor as required. 3. Paint all walls as required. 4. Remove all paint form hardware. 5. A thorough cleaning of this area will be required prior to final acceptance. MEN'S RESTROOM - 13Z 1. It appears that the light trough has been installed incorrectly and is not level in the north/south direction over the vanity area. Look at handicapped toilet stall - toilet has been installed at an incorrect location. It is too close to the south partition and does not meet handicapped code. Also in this compartment the south partition is dented and will need to be replaced. Look at numerous scratches and dings in the toilet partition which need to be corrected prior to acceptance. This is a typical note. WOMEN'S RESTROOM - 1Z7 1. Look at handicapped toilet stall - water closet has been installed at an incorrect location and will need to be relocated. Z. Caulk joint between water closet and wet walls typiCally. 3. Check on installation of wa/lcovering under vanity. 4. Caulk joint between vanity backsplash and vinyl wallcovering at wing walls. 5. The paper towel holder in this restroom is not consistent with the location of the paper towel dispenser in other restrooms in this building. It appears to be much closer to complying with the handicapped codes. The General Contractor will review and respond on this item. 6. Rework parabolic diffusers, trim and light trough in general in this restroom. CONFERENCE ROOM - 144 1. Remove stains from carpet. LIEUTENANT'S OFFICE- 145 1. Remove construction tools from this space. CORRIDOR AREA OUTSIDE OF INTERVIEW ROOM - 147 1. Repaint metal gun storage cabinet. Z. Clean paint from drug hopper cover plate. 3. Rework one-way window at Inbestigation Room - check on to make sure it works properly. INTERVIEW ROOM 1. Z. 3. 147 There are marks in the painted wall along the west wall. Clean all paint from trim track at head walls. Remove stains 'from vinyl flooring. PROPERTY STORAGE ROOM - 150 1. Rework hardware so door properly latches. Z. Remove stains from vinyl floor covering. 3. At south wall touch up wall near base. 4. Repaint north wall. INTOXILIZER ROOM - 153 1. Installation of deadbolt hardware on entry door to be ~ed by City. CORRIDOR - 155 I. Flush tight to ceiling the metal trim around the Z x Z and Z x 4 parabolic fixtures and rework ceiling around these units. 16 STORAGE- 152 1. Complete the installation of hardware in this area. Z. Finish drywall ceiling. 3. Seal joint between CMU and hollow metal door frame. KITCHEN - 158 Repaint access panel at west wall. Check on - at the direction of Mr. Ed Powell, City of Coppell, the upper cabinet west end, far door, needs to be made operational. A Construction Change Authorization will be processed and once signed by Mr. Powell work is to commence. Check to see if dryer to be installed - a dryer vent needs to be provided in the east wall as shown on Sheet A-Z. 4. Rework ceiling and snug trim metal pieces around light fixture tight to ceiling. SHOWER AREA- 159 1. To be covered - verify that light fixture which has been installed is correct light fixture for this space and purpose. VESTIBULE AREA OUTSIDE OF MEN'S CELL- 161 1. Change order - at Owner's request an additional florescent fixture will be provided to this area. Once a cost is obtained and approvsl is given by Owner this work will commence. 2. Clean up floor patching at south and east walls of this area. VESTIBULE AREA OUTSIDE OF THE WOMEN'S CELL- 163 1. Repaint door. CORRIDOR- 166 1. Z. There are numerous areas where the walls have been marred and need to be repainted. The east wall at base is extremely wavy and needs remedial work to be accomplished. This is also apparent on the west base too. Rework ceiling grid. Installed per plan - review installation of access hatch to jail cell area plumbing at east wall. It appears that this should not have been inset but should have been flush with this wall. 17 NORTH AREA OF COURT MULTI-PURPOSE - 165 1. Remove all stains from carpeting. Z. Rework carpeting at vinyl base area to close all gaps. SOUTH COURT MULTI-PURPOSE ROOM 165 1. Replace ceiling tile which was miscut around sprinkler heads. Z. It appears that there are numerous scratches and marks in the formica countertop. 3. Door ordered for this room (8-1-86). Door from this room to main lobby area missing. 4. There are numerous stains in the carpet which need to be removed prior to final acceptance. REPORTING AREA - 160 1. This room is hot, the General Contractor should insure that the testing and balancing is accomplished soon to insure that this area cools. CORRIDOR - 168 1. Properly set Door 19 and complete the taping, bedding and painting at the door head. It appears that the door head has been damaged and will need to be repaired. Z. Properly install vinyl base so joints align properly. WOMEN'S LOCKER ROOM - 170 1. Repaint ceiling. Z. Drywall in shower area needs to be patched and repainted. 3. Door 18 missing. 18