Loading...
CF-TownC CHC-PL-861113The City With A Beautiful Future. November 13, 1986 P. O. Box 478 Coppell, Texas 75019 214 * 462 * 0022 Sallinger, Nichols, Jackson, Kirk and Dillard Attorneys at Law 1800 Lincoln Plaza Dallas, Texas 75201 SUBJECT: Town Center Complex - Final Punch List ATTENTION: Mr. Larry Jackson, City Attorney Dear Larry: On November 3, 1986, we sent you a letter requesting your assistance in obtaining release of the retainage monies from the Bankruptcy Court for the To~ Center construction contract. In our verbal conversation, last Tuesday evening, we understood that it could take the court several months to consider our request. Due to the established schedule for the official dedication of this complex, and several items still remaining to be completed on this contract, we are requesting that you, as legal counsel for the City, contact the Bonding Company and determine wheat their obligations are in completing this project in a timely manner. Attached for ~our information is a copg of the final punch list prepared on September 11, 1986. Some items have been completed, however some items still remain, that need i~ediate attention. If ;.;e ca~ ~.rov~de £urther :information, please let us know. Sincerel y, PUNCHLIST FOR CITY HALL AS OF ~-11-86 ELEVATOR ~ 1. HAndrail needs to be sealed. Z. Baseboard needs to be sealed. 3. Light over capacity plate does not work. DOWNSTAIR'S BATHS 1. Women's bathroom has leaks aroound base of toilets. Z. Handicapped stalls need panel patched where~aper dispenser DOWNSTAIRS - LOBBY AREA -~1. Terazzo area needs to be stripped, sealed and rewaxed. was relocated. COUNCIL CHAMBERS !. -V4tiee-$er~e~~.b~-s~r~t-~t~eeL ........ · ,~ _=teps_laaclin~xicwn light a~e~l~-~o--be-cantcrcd in tile. KITCHEN 1. Clean windows both inside and outside. Z. Paint access panel for screen and trim out around screen. 3. Repair gaps under door leading to outside. 4. Ail bin§es and latches in kitchen need to be repaired. --~;-Ki~el~en disposat-doe~ not- work-.- 6. Ch?,'coal filler cm s:ov~- fo:- kilchc,r~ 'cc-'n: needs ro be installed. FINANCE COMPUTER ROOM I~-In.-ta!! ~ .... *^~ ;~ r; ..... WATER FOUNTAIN 1. T~im out around water fountain~ TAX OFFICE 1. Repaint south wall in tax office where roof has leaked. Z. North wall needs to be patched and repainted. 3. East wall - check for leak and repaint. BRYAN'S OFFICE ...... :. . .. STAIRWELLS 1. Doors will not latch in stairwells. STAIRS 1. Paint needs to be removed from concrete or paint concrete. I.FRRARY 1. Main entrance door does not latch. -P.-,-g~-~-p~pe~vm, TwO dov, o.r. cc_~ 3. Check leak in ceiling. IJRRARY COMPUTER ROOM 1. Secure insulation to roof in m&chanical room. U.:'E'i'AiRi; i. OF.}:5' AREA (top of stairwell) i. On N~orth wall there is a dip at window sill which needs to.bm_corrected. ADMINISTRATIVE OFFICES ,~ · '---' - :- --: - - :' ~a--~' -~- ~/ - -..--- Z. Tear in carpet behind first secretarT's station. DOROTHY'S AREA CITY MANAGER'S OFFICE 1. Clean top two window panels. ED POWELL'S OFFICES 1. Install door to engineering dept.)-)~f~:~ 4. ~nstall ~aw~-o~ament knob by ~'indows. CONFERENCE ROOM ~. ~e~aint north wall. FRANK TRANDO'S OFFICE i. Clean u'indo~vs on north side. BO'S OFFICE UPSTAIR'S BATHROOMS 1. 1st toilet in women's bathroom is out of order. Z. Wallpaper is coming loose in first stall. 3. Gap between tile and paper in first stall in women's battn-oom. 4. Handicapped stalls need panel patched where paper dispense,- was relocated. 5. In Men's room tile cracked. SIGNS 1. All city signage needs to be installed. WINDOWS ~t ALL REPAIRS NEED TO BE ACCOMPLISHED BY NOVEMBER 15, 1986 IN ORDER TO BE READY FOR OPEN HOUSE TO BE HELD ON DECEMBER 6, 1986.