Red Hawk Office-CS130926 MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To: Larry Davis, Construction Inspector Engineering
From: Frank Garza, Streets Dept.
Date: September 26,2013
RE: Final Walk Thru' Red Hawk Commercial Lot 28
1. Clean out storm drain box at back of building.
2. Strip redwood next to stamped concrete at approach and seal it.
3. Seal joint at approach where new concrete meets old concrete.
4. Seal joint whery curb was poured on Denton Tap.
5. ICI-130 K Eery PtiYa °& Si G 1d/ Iv! f2.a, G(i'
6, . gee? r2 Prow/"-9 t'.
Aii,
CITY OF COPPELL PUBLIC WORKS DEPARTMENT