Loading...
DR1201-CR130805 T H E C 1 T Y O F COPPELL 9 X t a DAILY CONSTRUCTION REPORT PROJECT: CREEKVIEW DR RETAINING Q / RN-2, WALL&ROADWAY DATE v 1REPORT# IMPROVEMENTS l'/ 7 DAY MIT WIT F S S PROJECT NO. DR 12-01 WEATHER SUN 4201011. OVERCAST RAIN SNOW OWNER: CITY of COPPELL TEMP To 32 32-51 50-70 70-85 85 rte— WIND Still Mod ) Hi h Overtime Form CONTRACTOR: FAIN GROUP HUMIDITY Dry Mod Humid Submitted? Y /N PROJECT INSP: LARRY DAVIS AVERAGE FIELD FORCE NAME OF NON-MANUAL MANUAL REMARKS CONTRACTOR/SUBCONTRACTOR VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: s ArC N� t 11 rs E /w IVG.e SUfffi, l'21 cree 11 lee pk, teve4 ,1'7 zEJ 7, /RiH9 or_ �fda gy &�idv 44d5Arel C/ C SIGNATURE ENGINEERING INSPECTOR