Loading...
DR1201-CR130806 thiFEIi 0 9 x A S t DAILY CONSTRUCTION REPORT PROJECT: CREEKVIEW DR RETAINING WALL&ROADWAY DATE i)L I Zd/3 REPORT# IMPROVEMENTS DAY I M I W I T F S I S PROJECT NO. DR 12-01 WEATHER SUN lryr OVERCAST RAIN SNOW OWNER: CITY of COPPELL TEMP To 32 32- I 50-70 70-85 85 up WIND Still Mod CO Overtime Form CONTRACTOR: FAIN GROUP HUMIDITY Dry Mod Submitted? Y /N PROJECT INSP: LARRY DAVIS �/ AVERAGE FIELD FORCE NAME OF NON-MANUAL MANUAL REMARKS CONTRACTOR/SUBCONTRACTOR VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: Se le f P igec iY19 add CeArkf peke? 14#// y� ill the 5i f//i %2y GNCe.44,40./ A4,44 zcielsr ��5! ii/se kvi"9 /�Pe&100 .ylui /tl'v,.� te/Pf74J`c,F65T 14e svt1/1LAOdU c,e0A-1/ke, Or � / SIGNATURE ENGINEERING INSPECTOR