DAILY CONSTRUCTION REPORT
PROJECT: CREEKVIEW DR RETAINING 0 r/4/ 4'7WALL&ROADWAY DATE J REPORT#
IMPROVEMENTS
DAY 16 1T W IT F IS jS
PROJECT NO. DR 12-01
WEATHER SUN OVERCAST RAIN SNOW
OWNER: CITY of COPPELL TEMP To 32 3-sn 50-70 70-85 85 QC�
WIND Still 4ed High Overtime orm
CONTRACTOR: FAIN GROUP HUMIDITY Dry Mod Submitted? Y /N
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTT OR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
Cvi `vact,e pi rki+ity AeSlf aPAl 1340 j`*-4)(
l!I SI"r ('!If liter
psf 7es7• ®y4 1z w mz'i 1
v ?lac%X, 7vvLI T 121 A/e'bi_e .'
/
SIGNATURE
ENGINEERING INSPECTOR