DR1201-CR130813 T H E • C 1 T Y • O F COPPELL F .--.- q A s 8 DAILY CONSTRUCTION REPORT PROJECT: WALL&ROADWAY AINING DATE l3I20, REPORT# IMPROVEMENTS DAY IM IT W ET IF S IS PROJECT NO. DR 12-01 WEATHER SUN .44; „„.OVERCAST RAIN SNOW OWNER: CITY of COPPELL TEMP To 32 32-50 50-70 70-85 85 up WIND Still ® High Overtime Form CONTRACTOR: FAIN GROUP HUMIDITY Dry Mod / Submitted? Y /N PROJECT INSP: LARRY DAVIS AVERAGE FIELD FORCE NAME OF NON-MANUAL MANUAL REMARKS CONTRACTOR/SUBCONTRACTOR VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: War, yl q • ,.t 041/ i�I07 546,r 4. e. Grptrrl/fig' C cC r i 11117 /l2 ildck 4-7!Ike° evavA • SIGNATURE ENGINEERING INSPECTOR