DR1201-CR130813 T H E • C 1 T Y • O F
COPPELL
F .--.- q
A s 8 DAILY CONSTRUCTION REPORT
PROJECT: WALL&ROADWAY AINING DATE l3I20, REPORT#
IMPROVEMENTS
DAY IM IT W ET IF S IS
PROJECT NO. DR 12-01
WEATHER SUN .44; „„.OVERCAST RAIN SNOW
OWNER: CITY of COPPELL TEMP To 32 32-50 50-70 70-85 85 up
WIND Still ® High Overtime Form
CONTRACTOR: FAIN GROUP HUMIDITY Dry Mod / Submitted? Y /N
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
War, yl q • ,.t 041/ i�I07 546,r 4. e.
Grptrrl/fig'
C cC r i 11117 /l2 ildck 4-7!Ike° evavA •
SIGNATURE
ENGINEERING INSPECTOR