Loading...
DR1201-CR130830 T H E • G 1 T Y • O F COPPELL A 15 DAILY CONSTRUCTION REPORT PROJECT: CREEKVIEW DR RETAINING WALL&ROADWAY DATE tI 3 dieP'.,REPORT# IMPROVEMENTS DAY M T W T S S PROJECT NO. DR 12-01 WEATHER SUN OVERCAST RAIN SNOW OWNER: CITY of COPPELL TEMP To 32 32-�u-, 50-70 70-85 85 orr . WIND Still 111 H�i:b Overtime Form CONTRACTOR: FAIN GROUP HUMIDITY Dry Mod Submitted? Y /N PROJECT INSP: LARRY DAVIS i/ AVERAGE FIELD FORCE NAME OF NON-MANUAL MANUAL REMARKS CONTRACTOR/SUBCONTRACTOR VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: Srt t C TA? ii(J- liA9 Y t/1 , 09,4 cre 40A'view J ro, ritc . !Arc s kite 'ar Aawrf's SIGNATURE ENGINEERING INSPECTOR