DR1201-CR130924 T H E • C 1 T Y • O F
COPPELL
T r >/may.. ic' !?„,tin-• O
X A S t DAILY CONSTRUCTION REPORT
PROJECT: CREEKVIEW DR RETAINING ,)? .,1
WALL&ROADWAY DATE 2013 REPORT#
IMPROVEMENTS �c
DAY M I �Y W T 1 F S S
PROJECT NO. DR 12-01
WEATHER SUN cAl7 OVERCAST RAIN SNOW
OWNER: CITY of COPPELL TEMP To 32 _...3.1,50) 50-70 70-85
WIND Still High Overtime Form
CONTRACTOR: FAIN GROUP HUMIDITY Dry Mod Submitted? Y /N
•
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
CO 47;414/` pe£fig /k e /WM.,/ 11Z
c,vee/c Wee-, .V,' hi /fZ 7
t`?11'e a2,7 �-o��C�► ��c°a®�1��'
SIGNATURE
ENGINEERING INSPECTOR