DR1201-CR130925 T H E C I T Y O F
COPPELL
* r
X A s I DAILY CONSTRUCTION REPORT
PROJECT: CREEKVIEW DR RETAINING
WALL&ROADWAY DATE 9 ?2 le REPORT#
IMPROVEMENTS //
DAY M � T IT IF IS � S
PROJECT NO. DR 12-01
WEATHER SUN +�'7� OVERCAST RAIN SNOW
OWNER: CITY of COPPELL TEMP To 32 50-70 70-85 ■�ifi
WIND Overtime Form
CONTRACTOR: FAIN GROUP HUMIDITY Dry Mod %amid 111 Submitted' Y /N
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
d c?Y1 u.
e,� fir e/4$0.4-e
Ci�le l�ra��
/ SIGNATURE
ENGINEERING INSPECTOR