Loading...
DR1201-CR130926 T N E • C 1 T Y • O F COPPELL o A 5 t a DAILY CONSTRUCTION REPORT PROJECT: CREEKVIEW DR RETAINING / /'� WALL&ROADWAY DATE J(�/�V'f��/ /REPORT IMPROVEMENTS / / n DAY M T W �/'I'/ F S S PROJECT NO. DR 12-01 ((// WEATHER SUN r, ' OVERCAST RAIN SNOW OWNER: CITY of COPPELL TEMP To 32 50-70 70-85 - CONTRACTOR: FAIN GROUP WIND Stdi �i Hig Overtime Form HUMIDITY Dry Promid / Submitted? Y /N PROJECT INSP: LARRY DAVIS MVP' AVERAGE FIELD FORCE NAME OF NON-MANUAL MANUAL REMARKS CONTRACTOR/SUBCONTRACTOR VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: c s1 Zerbr _ - ac'!K9 57.e / 1707■1%i47 C - - - - t � .IL I G P,,2ta/.,e , • it SIGNATURE ENGINEERING INSPECTOR