Loading...
DR1201-CR130927 T H E C I T Y O F COPPELL * -, o A s t $ DAILY CONSTRUCTION REPORT PROJECT: CREEKVIEW DR RETAINING - WALL&ROADWAY DATE 7/?7i Zell /12EPORT# IMPROVEMENTS (/ DAY M T W IT PS � S PROJECT NO. DR 12-01 �� WEATHER SUN a : ERCAST RAIN SNOW OWNER: CITY of COPPELL TEMP To 32 32-50 50-70 70-85 CONTRACTOR: FAIN GROUP WIND Overtime Form Still � I�� Submitted? Y /N HUMIDITY Dry Mod PROJECT INSP: LARRY DAVIS AVERAGE FIELD FORCE NAME OF NON-MANUAL MANUAL REMARKS CONTRACTOR/SUBCONTRACTOR VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: /1/- v/ S .�� ( 71 �Lcc 5�i7L1 t z L . 1 SIGNATURE ENGINEERING INSPECTOR