DR1201-CR130927 T H E C I T Y O F
COPPELL
* -,
o
A s t $ DAILY CONSTRUCTION REPORT
PROJECT: CREEKVIEW DR RETAINING -
WALL&ROADWAY DATE 7/?7i Zell /12EPORT#
IMPROVEMENTS (/
DAY M T W IT PS � S
PROJECT NO. DR 12-01 ��
WEATHER SUN a : ERCAST RAIN SNOW
OWNER: CITY of COPPELL TEMP To 32 32-50 50-70 70-85
CONTRACTOR: FAIN GROUP WIND Overtime Form
Still �
I�� Submitted? Y /N
HUMIDITY Dry Mod
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
/1/- v/ S .�� ( 71 �Lcc 5�i7L1 t z
L
. 1
SIGNATURE
ENGINEERING INSPECTOR