Loading...
CF-Cozby Library-CS 950412 COPPELL ENGINEERING MEMORANDUM DATE: April 12, 1995 TO: Larry Davis, Construction Inspector FROM: Howard Pafford, Utilities Superintendent RE: Follow up Walk Through for W.T. Cozby Library A follow up walk-thru was conducted and these following items remain deficient. Edge of vault covered by burm. Burm needs to be moved off the vault and both cans. dg