CF-Cozby Library-CS 950412 COPPELL ENGINEERING
MEMORANDUM
DATE: April 12, 1995
TO: Larry Davis, Construction Inspector
FROM: Howard Pafford, Utilities Superintendent
RE: Follow up Walk Through for W.T. Cozby Library
A follow up walk-thru was conducted and these following items
remain deficient.
Edge of vault covered by burm. Burm needs to be moved off the
vault and both cans.
dg