Loading...
CF-Cozby Library-CS 940520May 20, 1994 Mr. J. Kip Jameson F & S Partners, Inc 3535 Travis, Suite//201 Dallas, Texas 75204-1497 RE: W.T. Cozby Public Library Coppell, Texas Testing Budget Dear Mr. Jameson: Per your transmittal request dated April 12, 1994, we have reviewed our March, 1994 invoice for testing services performed for the above referenced project. The purpose was to provide an update on anticipated total cost. With the exception of engineering services performed on 03/16/94 ($160.00), 03/18/94 ($320.00) and 03/29/94 ($320.00), as well as in-place density tests performed on 03/27/94 (Saturday at an extra overtime cost of $36.75), all other costs incurred were generally anticipated. Engineering services were for analysis and letters related to the subfloor drain system and select fill. The unanticipated extra costs total $836.75. Future costs may be less than budgeted. Consequently, at this time a projection as to total costs cannot be made. Mr. J. Kip Jameson May 20, 1994 Page Two Please call if you have any questions. Sincerely, GEE Consultants, Inc. Richard W. Gee, P.E. President RW 3/lej cc: Gary Sieb - City of Coppell Mike Sherpinskas - Diversified Construction Services, Inc.