CF-Cozby Library-CS 940305 W. T. Cozby Public Library City of Coppell Coppell, Texas Preconstruction Conference Agenda FS 9113 March 5, 1994 Attendance Registration and Introduction of Participants Owner - Contractor Agreement Bonds and Insurance Notice to Proceed Building Permit Changes in the Work · Architect's Supplementary Instructions · Proposal Requests · Contractor Proposed Changes · Construction Change Directives · Change Orders Project Coordination · Communications · Phasing of the Work · Site Utilities Project Meetings · Pro~ess Meetings · Pre-Installation Meetings Submittals · Identification · Schedule of Values · Subcontractor List · Shop Drawings, Product Data and Samples · Substitution Request Form Construction Facilities and Temporary Controls · Project Identification Sign · Temporary Utilities · Field Office and Storage · Barriers and fences · Security and protection of existing work · Parking and access · Cleanup Applications for Payment Requests for Information Testing Agency Consulting Engineer Inspections Contract Close-out Other Items SUBMITYAL NUMBERING FORMAT Submittal procedures are described in general in Project Manual Section 01300, however, the following recommendations for submittal processing will enhance the receiving, tracking and returning of submittals in a timely fashion. · In accordance with paragraph I.I.D, submittals without the Contractor's review stamp will be returned to the Contractor without comment. · Number each submittal with a sequential transmittal number, the Project Manual Section number and a sequential number within that Section. For example, the first submittal of the job might be a concrete mix design, which would be numbered as follows: 01-03300.01 · The second submittal might be structural steel, and would be numbered as follows: 02-05120.01 · Additional submittals within a Section will incremented by one. If the third submittal for the job is another concrete mix design, it would be identified as follows: 03-03300.02 · Resubmittals can be identified with either an alphabetic suffix or an "R" with a numeric suffix added to the Section sequence number. The first resubmittal of the first mix design would then be numbered: 01-03300.01A or 01,03300,01R1 · In all cases, each submittal item must be identified with a unique number written on the submittal in the vicinity of the Contractor's review stamp.