CF-Cozby Library-LR 950124E GEE Consultants, Inc.
2540 Glenda Lane · Suite 108 · Dallas, Yexas 75229 · (214) 620-9791 · [ax (214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: January 24 1995 Date Concrete Placed: October 31, 1994 Standard 6'x12"
Client: City of Coppell Area 28.27 Square Inches
Protect: W.T. Cozby Public Library Concrete Report No. 39
Con',raclor: Jessy Burney Construction Co.
Con:rete Supplier and Plant: Texas Industries, Inc. - Plant #41
Location of P!acement: Building Main Entryway and Patios at SE & SW Corners
MATERIALS so~.=., sst~ B~,c~,'¥L~. INSPECTION DATA
D~c.d. pt ic~ , [.t~. CuYd,
.Mix Number: 8203 Time Sample Batched: 1:37 pm
Cement: Time Sampled: 2:55 pm
Fly Ash: Sample Location: Patio at SW Corner
Truck'Ticket No: 4 ,~-319.8.~
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 75'F
Fine Aggregate: Concrete Range: 56°F
Admixtures: Slump Range (inches): 8"
Weather Conditions: Paaly Cloudy
I AEA Time Started: 1:30 pm
2 Time Completed: 3:40 pt]]
Added Water: 20 gal Sample Air Conlent (~): No test
Total Cubic Yards Placed: 10.0 C.Y.
Required Streogth (Lbs...'sq.in.): 3.000
S~in~ ~.lca~ut~d Age Dam Total Lc~ Co~r...*n:~sN,: Stmng~ Re.n-arks
WTC 194 8" 7 01/20/95 77,620 2,750
WTC 195 8" 7 01/20/95 87,420 3,090
WTC 196 8" 28 02/10/95
WTC 197 8" 28 02/10/95
WTC 198 8" Hold Hold
ASTM C-31.C-39. C-ia3 · ;Unle. ~o~ Oh~'~r'&4..~) C.vlindcrs Made By: G. H.
Remarks and/or Distribution:
cc: Gary Sieb - City of Coppell
Larry Davis - City of Coppell
Mike Sherpinskas - Diversified Construction Services, Inc.
Jim Bullock - F & S Partners
Russell Williams - Brockette Davis Drake, Inc.
GEE Consultants, Inc. Reviewed by: