Loading...
CF-Cozby Library-LR 950124E GEE Consultants, Inc. 2540 Glenda Lane · Suite 108 · Dallas, Yexas 75229 · (214) 620-9791 · [ax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: January 24 1995 Date Concrete Placed: October 31, 1994 Standard 6'x12" Client: City of Coppell Area 28.27 Square Inches Protect: W.T. Cozby Public Library Concrete Report No. 39 Con',raclor: Jessy Burney Construction Co. Con:rete Supplier and Plant: Texas Industries, Inc. - Plant #41 Location of P!acement: Building Main Entryway and Patios at SE & SW Corners MATERIALS so~.=., sst~ B~,c~,'¥L~. INSPECTION DATA D~c.d. pt ic~ , [.t~. CuYd, .Mix Number: 8203 Time Sample Batched: 1:37 pm Cement: Time Sampled: 2:55 pm Fly Ash: Sample Location: Patio at SW Corner Truck'Ticket No: 4 ,~-319.8.~ Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 75'F Fine Aggregate: Concrete Range: 56°F Admixtures: Slump Range (inches): 8" Weather Conditions: Paaly Cloudy I AEA Time Started: 1:30 pm 2 Time Completed: 3:40 pt]] Added Water: 20 gal Sample Air Conlent (~): No test Total Cubic Yards Placed: 10.0 C.Y. Required Streogth (Lbs...'sq.in.): 3.000 S~in~ ~.lca~ut~d Age Dam Total Lc~ Co~r...*n:~sN,: Stmng~ Re.n-arks WTC 194 8" 7 01/20/95 77,620 2,750 WTC 195 8" 7 01/20/95 87,420 3,090 WTC 196 8" 28 02/10/95 WTC 197 8" 28 02/10/95 WTC 198 8" Hold Hold ASTM C-31.C-39. C-ia3 · ;Unle. ~o~ Oh~'~r'&4..~) C.vlindcrs Made By: G. H. Remarks and/or Distribution: cc: Gary Sieb - City of Coppell Larry Davis - City of Coppell Mike Sherpinskas - Diversified Construction Services, Inc. Jim Bullock - F & S Partners Russell Williams - Brockette Davis Drake, Inc. GEE Consultants, Inc. Reviewed by: