Loading...
CF-Cozby Library-LR 950123J G EOTECHNICAL E GEE Consultants, Inc. 2540 Glenda Lane · Suite ]0g ° Dallas, lexas 75229 ° (214) 620-9791 ° Fax (214) 620-9794 GENERAL REPORT Report Date J21'lu2ry 23, 1995 Inspection Date January 20, 1995 Client City of Coppell General Report No. 39 Project W.T. Cozby Library Coppell, Texas Identification Field Inspection Me'hod of Test Visu2J Inspection Page #1 of 1 Results On this date, January 20, 1995, reinforcing steel was inspected at the following locations: I. Paving section adjacent to dumpster 2. Paving section on north side of building main entrance No discrepancies were noted. Technician: D.J. cc: Gary Sieb - City of Coppell Larry Davis - City of Coppell Mike Sherpinskas - Diversified Construction Services, Inc. Jim Bullock - F & S Partners Russell Willimns - Brockette Davis Drake', Inc.