CF-Cozby Library-LR 941107G EOTECHNICAL
ENGINEERING GEE Consultants, Inc.
E INVIRONMENTAU
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214! 620-9791 · Fax (214i 620-9794
REPORT OF MORTAR MIX INSPECTION
Report Date: November 7, 1994 Date Mortar Placed: October 31, 1994 Standard 2"x2"
Client: City of Coppell Area 4 Square Inches
Project: W.T. Cozby Public Library Concrete Report No. 39
Contractor: Diversified Construction Services, Inc.
Concrete Supplier and Plant: Texas Industries, Inc. Plant #41
Location of Placement: Light Standards in Parking Lot
so~,~: SSD ,.,~ w~,. INSPECTION DATA
MATERIALS
Mix Number: Time Sample Batched: 12:50 pm
Cement: Time Sampled: 1:25 pm
Sample Location: Front Light
Fly Ar&h: Tmek;'l'ieket No: 386/293445
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 70°F
Fine Aegregate: Concrete Range: 76°F
- Slump Range (inches): None requested (4"-5")
Admixtures: Weather Conditions: Clear
1 A£A Time Started: 1:00 pm
2 Time Completed: 2:00 pm
Added Water: Sample Air Content (~'): No Test
Total Cubic Yards Placed: 3.5 CY
Required Strength (Lbs..%q.in.): 3,000
WTC 181 N/A 7 11/07/94 100,140 3,540
WTC 182 N/A 28 11/28/94
WTC 183 N/A 28 11/28/94
Test M¢',ho&q t'.tBLz, ed Fra~um Regular Cubes Made Bx': V · S.
Remarks and/or Distribution:
CC: Gary Sieb - City of Coppell
Larry Davis - City of Coppell
Mike Sherpinskas - Diversified Construction Services, Inc.
Jim Bullock - F & S Partners
Russell Williams - Brockette Davis Drake, Inc.
GEE Consultants, Inc. Reviewed by: ~~
All let~m and reports are for tl~ cxc.uaiv* use of k~ c.lem to 'horn the.- am a~dms~l and shaIJ ,-~ bas ~-produc~l *.ithoul I1~ 6,Il appr,:q,al of GEE Com-.'tant$. Lac. 'r:.~ u~ of our natr~ must
o~r prior wE:tern al~rox'al. Our let,.e.m a.nd .,~peas a,;p~)' only to 'A~ samp~: L~stcd and:or ~pec',cd a~l a~: not t~ce.nsari!y ~cl~ca!ix~ of '~ quantit:.cs of a .,;ga~utiy idemical or similar produc~,s.