ROOFING ENSPECTION REPORT
Roofing Report No. 22 Page 1 of 1
Report Date: November 17. 1994 Roo~,~ Mate~als t!s~xi
Inspection Date: November 16, 1994 Flashing
Client: City of Coppell
Project: W.T. Cozby Public Library
Contractor: Diversified Construction
Roofing Contractor: Berbice Corp.. King of Texas
Identification: Standing Seam Metal Roof, Single Ply
Test Procedure: Visual Observations
Weather Conditions: Cloudy
Ambient Temperature Range: 56°F
Number of Roofing Members: -0-
Square Feet Laid: -0-
Description of Roofing Operations:
Inspected progression of flashing and roofing construction. The following observations were noted:
1. EPDM wall tlashing damaged (hole) in north wall, northwest comer
2. Lack of proper termination bar and metal counter tlashing of EPDM at dortners
3. No continuous cleat at metal fascia on dormers
4. Notches in standing seams throughout to accommodate radius reversal
5. Lack of outer face cover plates at vertical notches in radius sections of fascia
6. Metal step and counter flashing not ~ompleted (or resolved) along sides of dormers
7. Standing seam panels nol complete on porte-cochere (entrance) roof
An inspection of roofing constn:ction and flashing is now being performed once per week.
cc: Gar)..' Sieb - City of Coppell
Larry. Davis - City of Coppell
Mike Sherpinskas - Diversified Construction Services, Inc.
Jim Bullock - F & S Partners
Russell Williams - Brockeue Davis Drake. Inc.
Technician: P.M. '"~/~ /
Our leRers and reports are for the exclusive use of the client to whom they are addressed. The use of our name must receive our prior w'rit*o:n approval. Our letters and reports
apply only to the sample tested and;or inspected, and are not necessarily indicative of the quantities of apparently identical or shnilar products.