Loading...
CF-Cozby Library-LR 941123G EOTECHNICAL E GEE Consultants, Inc. E [ NVIRONMENT-~L 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214', 620-9791 · Fax ~214~ 6'"0-9794 GENERAL REPORT Report Date November 23, 1994 ~nspection Date November 17, 1994 Client City of Coppell General Report No. 38 Project W.T. Cozby Library Coppell. Texas Identification Field Inspection Method of Test Visual Inspection Page #1 of 1 Results On this date, November 17. 1994, a representative of GEE Consultants. Inc. was present at the above referenced project to perform ',_he following services: Reinspection was performed on .'.he following items which had been reported as being incmnplete on 9/23/94. 1. Tube beams at grid lines #6.5 and #7.5 have had top connection clip angles at colmnns added and welded inplace. 2. The roof joist girder bottom chord ends have now been welded in place satisthctoriiy. 3. Field welds were visually examined for size and appearance. Our inspection was performed in accordance with project drawings and specifications. cc: Gary Sieb - City of Coppeil Larry Davis - City of Coppe[l Mike Sherpinskas - Diversified Construction Services. Inc. Jim Bullock - F & S Parmers Russell Williatns - Brockette Davis Drake, h:c. ~~- ~.~,..~ :2.2'/ ."' f