Loading...
CF-Cozby Library-LR 950125I G EOTECHNICAL ENGINEERING GEE Consultants, inc. E [NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 GENERAL REPORT Report Date January 25, 1995 Inspection Date January 13, 1995 Client City of Coppell General Report No. 40 Project W.T. Cozby Libra/'3.' Coppell, Texas Identification Field Inspection of Reinforcing Steel Placement Method of Test Visual Inspection Page gl of 1 Results On this date, January 13, 1995, reintbrcing steel was inspected at the following locations: l. Building Main Entrance 2. A porch at southwest corner of the building 3. A porch at southwest corner of the building No discrepancies were noted. cc: Gary Sieb - City of Coppell Larry Davis - City of Coppe]l Mike Sherpinskas - Diversified Construction Services. Inc. Jim Bullock - F & S Partners Russell Williams - Brockette Davis Drake. Inc.