CF-Cozby Library-LR 950125I G EOTECHNICAL
ENGINEERING GEE Consultants, inc.
E [NVIRONMENTAL
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794
GENERAL REPORT
Report Date January 25, 1995 Inspection Date January 13, 1995
Client City of Coppell General Report No. 40
Project W.T. Cozby Libra/'3.'
Coppell, Texas
Identification Field Inspection of Reinforcing Steel Placement
Method of Test Visual Inspection Page gl of 1
Results
On this date, January 13, 1995, reintbrcing steel was inspected at the following locations:
l. Building Main Entrance
2. A porch at southwest corner of the building
3. A porch at southwest corner of the building
No discrepancies were noted.
cc: Gary Sieb - City of Coppell
Larry Davis - City of Coppe]l
Mike Sherpinskas - Diversified Construction Services. Inc.
Jim Bullock - F & S Partners
Russell Williams - Brockette Davis Drake. Inc.