CF-Cozby Library-LR 941103G EOTECHNICAL ENGINEER[NG GEE Consultants, Inc. E INVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214i 620-9791 · Fax i214i 620-9794 ROOFING INSPECTION REPORT Roofing Report No. 16 Page i of 1 Report Date: November 3, 1994 ~oofin~ Materials t',,ed Inspection Date: October 26, 1994 Standi,ut Serous 1. Metal Panels Client: City of Coppell 2. Clip Covers 3. Metal Flashing Project: W.T. Cozby Public Library 4. Sonoplastic NP-I Contractor: Diversified Construction Sim, lc Ply Rttbber Membrane I. Polyiso HPT Insulation and Tapered Boards Roofing Contractor: Berbice Corp.. King of Texas 2. Carlisle 045 EPDM Membrane 3. Locking Seam Plates Identification: Standing Seam Metal Root', Single Ply 4. Screws 5.6' Reinforced Membrane Test Procedure: Visual Observations 6. Sure Seal Splice Cleaner 7. Sure Seal Splicing Cement 8. In-seam Sealant 1124 9. Sure Seal Black Lap Sealant 10. Elasto form I 1. Filter Fabric 12. River Gravel Weather Conditions: Partly Cloudy Ambient Temperature Range: 65°F - 70°F Number of Roofing Members: Berbice-6. King of Texas-7 Square Feet Laid: Berbice 6 panels on E-W roof. 2 panels on N-S rtxqf, King of Texas 22'x100' Description of Roofing Operations: SinRle Ply Rttbber .Membrane Arrived on site at 10:45 am. King of Texas was completing laying isoboard insulation. Filter Fabric and rounded river rock ballast bad been placed on membrane layed on October 24. 1994. Eight (8) panels were brought to the attention of King of Texas as being wet and ,,,,'ere replaced. Reinforcing membraoc, locking seam plates and screws were used along parapet walls. Sure Seal Splice Cleaner and Sure Seal Splicing Cement were used at the base of the parapet walls. Carlisle 90-8- 30A Bonding Adhesive was used to glue the EPDM membrane to the plywood surface of the parapet walls. Interior EPDM joints were constructed suing Sure Seal Splice Cleaner, Sure Seal Splicing Cement. a bead of In-Seam Sealant 1124, and Sure Seal Black Lap Sealant. EPDM intersection joints were also seaied with Elastoform. Roof drains and all roof penetrations ',,.'ere sealed with two layers of £PDM membrane. Filter Fabric and river rock ballast were then placed on the days roofing area. An area o fponding water ~uth of the north-south standing scant roof was brought to the anention of Mike Sherpinskas of Diversit~ed and King ofTexas. Both agreed that tapered insulation not included in plans was needed at this location. We request this to be reviewed. St,'mding Seam Metal Roof Berbice Corp continued to lay standing seam panels on top of the west dormers and now on the north-south curved skylight roof. Joints of Clip Covers were being sealed with Sonoplastic NP-I caulking. cc: Ga~' Sieb - City of Coppell Lan')' Davis - City of Coppell Mike Sherplnskas - Diversified Construction Se~'ices, Inc. Jim Bullock - F & S Partners Russell Williams - Brockette Davis Drake, inc. Technician: P.M. ~ ~ Our letters and reports are for thc exclusive use of the client to whom they are addressed. The usc of our name must receive our prior wrinen approval. Our lencrs and reports apply only to the sample tested and/or inspected, and are not necessarily indicative of thc quantifies of apparently identical or similar products.