Loading...
CF-Cozby Library-LR 941103 (2) G E OTECHNICAL E GEE Consultants, Inc. 2540 Glenda Lane · Suite 108 · Dallas. Texas , ~,~9 · (214) 620-9791 · Fax 1214'! 620-9794 ROOFING INSPECTION REPORT Rooting Report No. 17 Page I of 1 Report Date: November 3. 1994 Roo~.~ Mat~ri,,~ t.'~,*d Inspection Date: October 27, 1994 Standinll Seam 1. Metal Panels Client: CiLv of Coppell 2. Clip Covers 3. Metal Flashing Project: W.T. Cozby Public Library 4. Sonoplastic NP-I Contractor: Diversified Construction Single Ply Rubber .Membrane 1. Polyiso HPT Insulation and Tapered Boards Roofing Contractor: Berbice Corp., King of Texas 2. Carlisle 045 EPDM Membrane 3. Locking Seam Plates Identification: Standing Seam Metal Roof, Single Ply 4. Screws 5. 6' R¢inl'orced Membrane Test Procedure: Visual Observations 6. Sure Seal Splice Cleaner 7. Sure Seal Splicing Cement 8. In-seam Sealant 1124 9. Sure Seal Black Lap Sealant 10. Elastoform I1. Filter Fabric 12. River Gravel Weather Conditions: Clear Ambient Temperature Range: 40°F - 65°F Number et'Roofing Members: Berbice-6. King of Texas-6 Square Feet Laid: Berbice 20 panels on middle roof Berbice 6 panels on side roof King of Texas 20'x100' Description of Roofing Operations: Sin~,le Ply Rubber Membrane Arrived on site at 8:00 am. King ofTexas cmnpleted laying isoboard insulation at 10:30 am. Reinforcing membrane, locking seam plates and screws were used along parapet and vertical walls. After removing temporary cemented splices. Sure Seal Splicing Cement was used at the base of the walls. Carlisle 90-8-30A Bonding Adhesive was used to glue the EPDM membrane to the plywood surfaces. Interior EPDM joints were constructed using Sure Seal Black Lap Cleaner. Sure Seal Splicing Cement. a bead of In-Seam Sealam 1124, and Sure Seal Black Lap Sealant. EPDM intersecting joints were also sealed with Elastoform. Roof drains and all roof penetrations were sealed with two (2) layers of EPDM membrane. Filter Fabric and river rock ballast were then placed on the days roofing area. Standing Seam Metal Rnof Berbice Corp continued to lay standing ,~am panels on top of the dormers and on the north-south curved skylight roof. Clip Covers were being sealed with Sonoplastic NP-1 caulking. cc: GaD' Sieb - City oF Coppeli Larry, Davis - City of Coppell Mike Shcrpinskas - Diversified Construction Services, Inc. Jim Bullock - F & S Permits Russell Williams - Brockelte Davis Drake, Inc. Technician: W,S. Our letl~rs and reports am for the exclusive use of the client to whom they are addressed. The use of our name must receive our prior wriuen approval. Our letters and reports apply only to the sample tested and'or inspected, and arc no~ necessarily indicative of the quantifies of apparently identical or similar products.