NL 635 BP (15)-CS130927 T H E C 1 T Y O F
COPPELL
F 9
A 5
Will Janney, P.E. September 27, 2013
Halff Associates, Inc.
3803 Parkwood Blvd. Ste 800
Frisco, TX 75034
RE: Northlake 635 Business Park, Lot 4 Block D
Dear Mr. Janney:
The City of Coppell has reviewed the referenced plans and has the following comments to offer:
General—
1. Place erosion protection at the outfall of the flumes.
2. Do you have any roof drains that will tie into the storm drain or does it just sheet flow off of
the roof onto the truck court and fire lane? Roof drains would help.
The City of Coppell requires three sets of final construction plans for its use; your office should
submit as many additional sets for stamping as is necessary for construction operations. All
contractors and subcontractors onsite must have a copy of the plans approved by the City of
Coppell along with a copy of the City's standard construction details.
All fees must be paid prior to release of this project for construction. The City charges a 2%
inspection fee for all private construction outside the building's footprint. This includes dirt
work, paving, storm drains, water lines, sewer lines, drainage pipes, etc. that are private. For all
installations in the public right-of-way or easement, the City charges a 4% fee. A check for
inspection fees made to the City of Coppell should be submitted to this office along with the
Construction Development Permit Application and a copy of the Construction Site Notice. For
your convenience a spreadsheet is attached to the permit application for use in calculating the
inspection fees. A copy of the contract(s) should be attached for verification purposes.
If you have any questions, please contact me at your convenience.
Since ly
M ch. 1 Ga 0, P.E.
Civil Engineer
Office Phone: (972) 304-7019
Fax: (972) 304-3570
mgarza@coppelltx.gov
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673