CF-Cozby Library-LR 941031 G EOTECHNICAL
E GEE Consultants, Inc.
E l
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214} 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: October 31, 1994 Date Concrete Placed: September 29, 1994 Standard 6"x12"
Client: City of Coppell Area 28.27 Square lnch.-'s
Project: W.T. Cozby Public Library Concrete Report No.35
Contractor: Diversified Construction Services, Inc.
Concrete Supplier and Plant: Texas Industries, Inc. - Plant #41
Location of Placement: Front Parking Area
s~=- ss~ ..,~ w~. INSPECTION DATA
MAT ERIALS
Mix Number: 8203 Time Sample Batched: 11:03 am
Cement: Time Sampled: 11:30 am
Sample Location: West side of expansion joint-front entrance
Fly Ash: Truck:Ticket No: 98/280697
Coarse Aggregate: I" C.S. Temperature:
Intermediate Aggregate: Ambient Range: 95 o F
Fine Aggregate: Concrete Range: 80°F
Slump Range (.inches): 5.5
Admixtures: Weather Conditions: Clear
1 AEA Time Started: 7:45 am
2 Time Completed: 12:30 pm
Added Water: Sample Air Content (%): No test
Total Cubic Yards Placed: 130.0 C.Y.
Required Strength (Lbs.:sq.in.): 3.000
S~im~n M~ut~ A~ ~ To~ L~ C~sslxc Stm~ Rc~ar~
WTC 176 5.5 5 10/04/94 76,900 2,720
WTC 177 5.5 7 10/06/94 82,360 2,910
WTC 178 5.5 28 10/27/94 110,060 3,890
WTC 179 5.5 28 10/27/94 104,540 3,700
WTC 180 5.5 Hold Hold
Remarks and;or Distribution:
cc: Gary Sieb - City of Coppell
Larry Davis - City of Coppell
Mike Sherpinskas - Diversified Construction Services, Inc.
Jim Bullock - F & S Partners
Russell Williams - Brockette Davis Drake, Inc.
GEE Consultants, Inc. Reviewed by: ~~
All ~e:ters ired mporLn am for the exclu~i,,e use of ~ c[iem to ,a. hom they am addressed and sFaU net bc tepiX:TdUt. Xxt 'a. idmut the ~ approval of GEE Conaultams, Ir, e. Tte me of eta' nan,g must receive
our prior written a.m;ro,,-a]. Our ~t~:rs atxl tcwnns ag,;ly only to th: sam~l~ teaux[ ani'ot b-~pe.c't~ ~,d am no~ ,",e.c~saariiy indlcativ~ of th~ quantities of apparently idgnfical er similar