Loading...
CF-Cozby Library-LR 941031 G EOTECHNICAL E GEE Consultants, Inc. E l 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214} 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: October 31, 1994 Date Concrete Placed: September 29, 1994 Standard 6"x12" Client: City of Coppell Area 28.27 Square lnch.-'s Project: W.T. Cozby Public Library Concrete Report No.35 Contractor: Diversified Construction Services, Inc. Concrete Supplier and Plant: Texas Industries, Inc. - Plant #41 Location of Placement: Front Parking Area s~=- ss~ ..,~ w~. INSPECTION DATA MAT ERIALS Mix Number: 8203 Time Sample Batched: 11:03 am Cement: Time Sampled: 11:30 am Sample Location: West side of expansion joint-front entrance Fly Ash: Truck:Ticket No: 98/280697 Coarse Aggregate: I" C.S. Temperature: Intermediate Aggregate: Ambient Range: 95 o F Fine Aggregate: Concrete Range: 80°F Slump Range (.inches): 5.5 Admixtures: Weather Conditions: Clear 1 AEA Time Started: 7:45 am 2 Time Completed: 12:30 pm Added Water: Sample Air Content (%): No test Total Cubic Yards Placed: 130.0 C.Y. Required Strength (Lbs.:sq.in.): 3.000 S~im~n M~ut~ A~ ~ To~ L~ C~sslxc Stm~ Rc~ar~ WTC 176 5.5 5 10/04/94 76,900 2,720 WTC 177 5.5 7 10/06/94 82,360 2,910 WTC 178 5.5 28 10/27/94 110,060 3,890 WTC 179 5.5 28 10/27/94 104,540 3,700 WTC 180 5.5 Hold Hold Remarks and;or Distribution: cc: Gary Sieb - City of Coppell Larry Davis - City of Coppell Mike Sherpinskas - Diversified Construction Services, Inc. Jim Bullock - F & S Partners Russell Williams - Brockette Davis Drake, Inc. GEE Consultants, Inc. Reviewed by: ~~ All ~e:ters ired mporLn am for the exclu~i,,e use of ~ c[iem to ,a. hom they am addressed and sFaU net bc tepiX:TdUt. Xxt 'a. idmut the ~ approval of GEE Conaultams, Ir, e. Tte me of eta' nan,g must receive our prior written a.m;ro,,-a]. Our ~t~:rs atxl tcwnns ag,;ly only to th: sam~l~ teaux[ ani'ot b-~pe.c't~ ~,d am no~ ,",e.c~saariiy indlcativ~ of th~ quantities of apparently idgnfical er similar