Loading...
Red Hawk Office-CS131008 T H E C 1 T Y O F COPPELL A * ,0 ,4- 9 October 8, 2013 Terry Holmes Holmes Commercial Builders 225 SH 121 Coppell TX 75019 RE: Red Hawk Addition, Lot 28R Block A(Red Hawk Commercial) Final Acceptance Dear Mr. Holmes: The City of Coppell recently completed a walk-thru inspection for the improvements in the referenced project. All punch list items have been completed, however, listed below is an item that must be addressed prior to final acceptance: 1. A Final Acceptance letter will be issued upon receipt of the two-year maintenance bond in the amount of 50%of the contract for paving. Thank you for your cooperation during the construction of this project. Sincerely, A Lamâ–º Michae ii F P.E. Assistant Director of Engineering Office Phone: (972) 304-7019 Fax: (972) 304-3570 cc: Ken Griffin, P.E., Director of Engineering& Public Works Keith Marvin, P.E., Asst. Director of Public Works Michael Arellano, Chief Building Official Tim Oates, Deputy Chief/Prevention 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673