Loading...
ST9904-CS131007 NTTA. NORTH TEXAS TOLL WAY AUTHORITY 5900 West Plano Parkway,Suite 100 • Plano,Texas 75026 • (214)461-2000 • Fax(214)528-4826 • www.ntta.org October 7, 2013 Mike Garza Civil Engineer City of Coppell 255 Parkway Boulevard Coppell, TX 75019 RE: NOT for Storm Water Discharges Associated with Construction Activity Sam Rayburn Tollway Segments 1, 2, & 3 Landscape and Irrigation Improvements Contract Number: 02353-SH 121-00-CN-MA Dear Mr. Garza, On behalf of the North Texas Tollway Authority, please find the enclosed Notice of Termination (NOT)for Storm Water Discharges associated with the construction of the Sam Rayburn Tollway (SRT) Segments 1, 2, and 3 Landscape and Irrigation Improvements, authorized under the Texas Pollution Discharge Elimination System Construction General Permit (TXR150000). This notice is being provided to advise you of the termination of construction activities that could have resulted in a discharge to your Municipal Separate Storm Sewer System in accordance with the terms of TXR150000. If you have any questions concerning storm water management associated with this project, please contact Joseph "Moss" Fennell at 214-461-2021 or jfennell @ntta.org. Sincerely, Elizabeth w, P.E. Assistant Executive Director of Infrastructure EM/dIn Enclosure: SRT Segments 1, 2, & 3 Landscape Project NOT cc: Moss Fennell, HNTB Marc Moser, Lamb-Star