Loading...
CF-Cozby Library-LR 941004 (3)G EOTECHNICAL E GEE Consultants, Inc. 2540 Glenda Lane · Suite 10g · Dallas, Texas 75229 · (214i 620-9791 · Fax (214:: 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: October 4, 1994 Date Concrete Placed: September 27, 1994 Standard 6"x12" Client: City of Coppell Area 28.27 Square In~he~ Project: W.T. Cozby Public Library Con~ret~ Repo~ No.31 Contractor: Diversified Construction Services, Inc. Concrete Supplier and Plant: Texas Industries, Inc. - Plant #41 Location of Placement: Southwest Side of Building ~- sso ~w~. INSPECTION DATA MATERIALS ~.~ ~Lbe-cuv~ Mix Number: 8203 Time Sample Batched: 9:21 am Cement: Time Sampled: 10:00 am Sample Location: Beginning of sidewalk of back Fly Ash: Truck/Ticket No: 86/278924 Coarse Aggregate: 1' C.S. Temperature: Intermediate Aggregate: Ambiem Range: 85°F Fine Aggregate: Concrete Range: 80°F Slump Range (inches): 5.5 Admixtures: Weather Conditions: Clear 1 AEA Time Started: 7:30 am 2 ADMLX Time Completed: 3:45 pm Added Water: Sample Air Content (%): 2.0 Total Cubic Yards Placed: 125.0 C.Y. Required Strength (Lbs.:sq.in.): 3.000 Spcch~cn Mca.sured Age Dam Tc~l Lo~ WTC 136 5.5 3 09/30/94 62,380 2,210 WTC 137 5.5 7 10/04/94 90,380 3,200 WTC 138 5.5 28 10/25/94 WTC 139 5.5 28 10/25/94 WTC 140 5.5 Hold Hold Test MeW~ L'd:~ Fra~g Reg~ar Cylinders Made A~%t C-3i.C-39.C-143 mL'r~s Nc~ O~r~-~ ' Remarks and,:or Dist6bution: cc: Gary Sieb - City of Coppell Larry Davis - City of Coppeli Mike Sherpinskas - Diversified Construction Services, Inc. ar ners Russell Willies - Brockette Davis Drake, Inc. / All [etgm and mpor,~ an: for the excluai'~ u~ of the clime to when tbey am addmased ami shall .not be repro:luted without thc rial[ a.~al of GEE CommJtama. lac. T'be use of out nam: mgs[ r=c~iv~ ma' l~ior ~.ritten approval. Out ktt~rs and ~pom apply oexly ~ Ihe sample t~atod and;or imgoctod artl am mx neoe~afily imlicati~ of the quantiti~m of alN~mmly identical or similar products.