Loading...
CF-Cozby Library-LR 940927 (2) E GEE Consultants, Inc. 2540 Glenda Lane · Suite 108 · Dallas. Texas 75229 · ~214i 620-9791 · Fax ~214', 620-9794 GENERAL REPORT Report Date September 27, 1994 Inspection Date September 23, 1994 Client City of Coppell General Report No. 37 Project W.T. Cozby Library Coppell. Texas Identification Field Inspection Method of Test Visual Inspection Page #1 of 1 Results On this date, September 23, 1994. a representative of GEE Consultants, Inc. was present at the above referenced project to perform the following services: 1. Radiused roof girder extensions are now welded properly to the supporting stub columns at line "A". 2. Radiused roof deck on front canopies have been welded to completion and are satisfactory. 3. Roof joists that had top chord damaged by burn holes have now been repaired by adding a round bar stock length and welding in place. 4. The brick lintel angle along line "A" has been welded in place satisfactorily. 5. Tube beams at line #6.5 and #7.5 have missing top connection clip angles at columns. 6. The roof joist bottmn chord ends will be welded atier the roof dead load has been applied. 7. Above items were brought to the attention of project superintendent. Field welds were visually examined for size and appearance. Our inspection was performed in accordance with project drawings and specifications. cc: Gary Sieb - City of Coppell i, /Q~?,/~/~/~ Larry Davis - City of Coppell .. Mike Sherpinskas - Diversified Construction Services, Inc Jim Bullock - F & S Partners Russell Williams - Brockette Davis Drake, Inc. ~