Loading...
CF-Cozby Library-LR 940919G EOTECHNICAL ENGINEERING GEE Consultants, Inc. E INVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · 1.214) 620-9791 · Fax t214) 620-9794 GENERAL REPORT Report Date September 19, 1994 Inspection Date September 13, 1994 Client City of Coppell General Report No. 35 Project W.T. Cozby Library Coppell, Texas Identification Field Inspection Method of Test Visual Inspection Page #1 of 1 Results On this date, September 13, 1.994, a representative of GEE Consultants, Inc. was present at the above referenced project to perform the following services: 1. Reinspection was performed on roof metal deck 2. The radiused roof deck from line "A' to line 'C" has been reworked. We found that the areas previously marked have been repaired satisfactorily. 3. The column base plates in above area are in the process of being grouted. 4. The radiused truss extension connections at line 'A" have not yet been completed. 5. The radiused roof deck at front canopy entry has not yet been welded to supports at each end. Our inspection was performed in accordance with project drawings and specifications. cc: Gary Sieb - City of Coppell Larry Davis - City of Coppell Mike Sherpinskas - Diversified Construction Services, Inc. lira Bullock - F & S Partners Russell Williams - Brockette Davis Drake, Inc. ~.,/r~--~x ~