Loading...
CF-Cozby Library-LR 940913I G EoTECHNICAL ENGINEERING GEE Consultants, inc. E INVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214~ 620-9791 · Fax (214~ 620-9794 GENERAL REPORT Report Date September 13, 1994 Inspection Date September 7, 1994 Client City of Coppell General Report No. 33 Project W.T. Cozby Library Coppell, Texas Identification Field Inspection Method of Test Visual Inspection Page gl of I Results On this date, September 7, 1994, a representative of GEE Consultants, Inc. was present at the above referenced project to perform the following services: 1. The radiused roof metal deck was inspected from grid line mA" to line "C". Numerous places were marked with red spray paint where puddle welds and side-lap screw's had been omitted. 2. The remainder of the flat roof metal deck was inspected frown line mC" to line "J" and was found to be satisfactory. 3. The front canopy metal deck has not yet been completed. Our inspection was perfi)rmed in accordance with project drawings and speci_fications. cc: Gary Sieb - City of Coppell Larry Davis - City of Coppel[ Mike Sherpinskas - Diversified Construction Services, Inc. Jim Bullock - F & S Partners Russell Willia~ns - Brockette Davis Drake, Inc.