ST 00-03 Coppell Road
Project limits are from south of Cooper Lane to Sandy Lake Road
Ultimate design is for a 34’ wide concrete street.
37’ Street with turn lane in front of Wilson Elementary
8’ Hike and Bike trail on West side of Coppell Road
4’ Sidewalk on East side of the road
OO
Engineering Department
C i t y o f C o p p e l l
OO
Engineering Department
C i t y o f C o p p e l l
4’
34’ to 37’
8’ Trail
Sidewalk
Concrete
West Side
East Side
Street
Ultimate design is for a 34’ wide concrete street.
37’ Street with turn lane in front of Wilson Elementary
8’ Hike and Bike trail on West side of Coppell Road
4’ Sidewalk on East side of the road
OO
Engineering Department
C i t y o f C o p p e l l
ST 00-03 Coppell Road
Project was funded through the 1998 Bond Program
Discussions began with Huitt Zollars in 2000 for engineering design
In 2003 the City Council approved a resolution allowing for one-way
Traffic for the duration of the project
In 2007 we began the process of acquiring right of way and easements
necessary for the project
Contract awarded to Tiseo Paving at the April 8, 2008 City Council Meeting
Construction is slated to begin in Late May.
OO
Engineering Department
C i t y o f C o p p e l l
OO
Engineering Department
C i t y o f C o p p e l l
Phase 1
Phase 2
New
Phase 2
14’ New
12”
Northbound
Pavement
Water
Traffic on
Line
West Side of
Road
Phase 2
New
Phase 1
Storm
Northbound
Drain
Traffic on
East Side of
Road
Construction is broken into three phases.
Phase 1 –New 12” Water Line along the West side of Coppell Road.
Phase 2 –New Storm Drain and Paving on East side of the road.
Phase 1 and 2 can be done concurrently if the contractor uses multiple crews and
OO
staggers their work locations.
C i t y o f C o p p e l l
Phase 3
Phase 3
Balance
Northbound
of Paving
Traffic on
20’ to 23’
East Side of
Road
Phase 3
Complete
Storm
Drain
Phase 3 –Complete Storm Drain.
Construct Balance of Concrete Paving.
OO
Engineering Department
C i t y o f C o p p e l l
OO
Engineering Department
C i t y o f C o p p e l l
Emergency
Response Why did we decide to make the road
Route
northbound only?
Traffic counts indicate a total volume of
approximately 5500 vehicles per day
divided nearly equally between
northbound and southbound.
The final decision was based on
Emergency Response. This area is
served by Fire and EMS from Fire Station
No. 1 on Southwestern Blvd.
When precious seconds count, the Fire
Coppell
Department will have unimpeded access
Fire
from the station to all the homes within the
Station
No. 1
project area.
OO
Engineering Department
C i t y o f C o p p e l l
Where are we now?
Utility companies are in the process of identifying and relocating conflicts.
We have entered into a contract for $2,857,846.30 with Tiseo Paving.
We have allocated $200,000 for early completion incentives.
st
Tiseo can begin mobilizing and working on Phase I as early as May 1.
Closure of the southbound side of the road will begin no earlier than
June 9, 2008.
The contractor has 365 calendar days to complete the project.
We have allocated $200,000 for early completion incentives.
OO
Engineering Department
C i t y o f C o p p e l l
Completion Incentives
Project completion date is June 8, 2009.
The contractor will be awarded a bonus of $1,000 per day
for completion prior to June 8, 2009.
The contractor will be awarded a $200,000 bonus if the project
Is completed by December 31, 2008.
If the contractor fails to complete the project by by June 8, 2009
They will be assessed damages in the amount of $1,000 per day.
OO
Engineering Department
C i t y o f C o p p e l l
Potential Traffic Concerns
Increase in traffic on alternate streets.
Traffic in alley.
School congestion during morning drop-off and afternoon pick-up.
Drivers finding alternate locations to drop off or pick up students.
Disregarding traffic control devices.
We are currently evaluating traffic patterns in this area.
Once construction begins we will monitor these and any other issues
that may arise. We will take action if issues arise that pose a safety hazard,
or create an undue hardship on adjacent property owners.
OO
Engineering Department
C i t y o f C o p p e l l
Fire Chief
City Manager
Deputy Fire Chief
Project Engineer
City Engineer
Former Mayor
OO
Engineering Department
C i t y o f C o p p e l l
Construction Inspector
Project Engineer
Albert Samaniego
Keith R. Marvin, P.E.
Phone: 972-304-3685
Phone: 972-304-3681
Fax: 972-304-3570
Fax: 972-304-3570
asamaniego@ci.coppell.tx.us
kmarvin@ci.coppell.tx.us
Contractor
Tiseo Paving, Inc.
Phone: 972-289-0723
Fax: 972-216-5637