ST0502A-CS120531
Rhonda Adloo
From:Chris B. Seely <cseely@tnp-online.com>
Sent:Thursday, May 31, 2012 10:19 AM
To:Keith Marvin; Michael Garza
Subject:Freeport Parkway - south of Sandy Lake
Keith / Mike:
I was reviewing our contract again to make sure everything was being addressed in the plans. I noticed that we have an
amount set aside for landscape and irrigation design. If memory serves me right, I believe we discussed this and decided
to wait since we were not constructing all 6 lanes at this time. Is that correct?
Also, Keith, has the Planning Department determined the type of bridge lighting that they would like to see on Freeport
and Sandy Lake? We will research the type and specifications if they have a photo or location to review.
Thanks!
Chris
Chris Seely, P.E.
(TX)
Project Manager
TEAGUE NALL AND PERKINS, INC
.
17304 Preston Road Suite 1340
Dallas, Texas 75252
214.461.9867 phone
214.461.9864 fax
cseely@tnp-online.com
www.tnp-online.com
1