On this date a representative of GEE Consultants, Inc was present at the above referenced project to perform
the following services:
I. The steel erector continues welding roof framing connections from line 'A' to line 'C".
2. Roof metal deck has been installed over the radiused tresses line 'A" to "C', but has not yet been
welded to completion.
3. Brick lintel and supporting angle hangers are being welded in place along line 'J" front of building.
4. Roof joists are being erected at southwest comer at mdiused wall, line #12 to #13 and "A.5" to "B.5'.
5. Field welds were visually examined for size and appearance.
Our inspection was performed in accordance with project drawings and specifications.