Loading...
CF-Cozby Library-LR 940825 (2)I G EOTECHNICAL ENGINEERING GEE Consultants,-lnc. F INVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (2141 620-9794 GENERAL REPORT Report Date August 25, 1994 Inspection Date August 24, 1994 Client City of Coppell Oeneral Report No. 31 Project W.T. Cozby Library. Coppell, Texas Identification Field Inspection Method of'Test Visual Inspection Page #1 of i Results On this date a representative of GEE Consultants, Inc was present at the above referenced project to perform the following services: I. The steel erector continues welding roof framing connections from line 'A' to line 'C". 2. Roof metal deck has been installed over the radiused tresses line 'A" to "C', but has not yet been welded to completion. 3. Brick lintel and supporting angle hangers are being welded in place along line 'J" front of building. 4. Roof joists are being erected at southwest comer at mdiused wall, line #12 to #13 and "A.5" to "B.5'. 5. Field welds were visually examined for size and appearance. Our inspection was performed in accordance with project drawings and specifications. cc: Gary Sieb - City of Copp~ll Larry Davis - City of Coppell Mike Sherpinskas - Diversified Construction Services, Inc. Jim Bullock - F & $ Partners Russell Williams - Brockette Davis Drake, Inc.