Loading...
CF-Cozby Library-LR 940907I G EOTECHNICAL ENGINEERING GEE Consultants, Inc. E INVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214~ 620-9791 · Fax (214i 620-9794 REPORT OF EN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 25 Method: ASTM D2922 D3017 D698 Page i of 1 Client: City of Coppeli Material Deserilotion Maximum Opthnmn DO' Moisture Density Content Project: W.T. Cozby Library (Lbs/CuFt) Pcrcem Test Date: August 31, 1994 1. Reddish Brown Clayey Sand (Select Fill) 112.5 13.2 Report Date: September 7, 1994 2. Dark Gray Clayey Sand 101.5 18.9 113.9 12.0 Required Density (~): Minimum 95% 3. Dark Gray Silty Sandy Clay 95.9 21.4 Required Moisture (%):_2% of Opt. 4. Lime Treated Dark Brown Silty Clay Mat Location/Elevation (and/or) Lift In-Place In-Place Percent No. DO' Density Moisture Ctnnpaction Test No. (Lbs, CuFt) Content (%) Probe Dq~th 4 25' west, 6' south of northeast corner 128 102.6 18.2 107.0 6" Pavement Subgrade 4 8' south, 40' east of northwest corner 129 95.7 23.1 99.8 6" Pavement Subgrade Note: Extra test at request of City of Coppell cc: GaO' $i¢b - Ci.ty of Coppcll Larry.' Da,As - Ci~' of Coppcll Mike Sherpinskas - Diversified Constructio~ Services. Inc. Jim Bullock - F & S Parmers Robert Williams - Brocket~e Davis Drake. [nc.