Loading...
CF-Cozby Library-LR 940815 E GEE ConsUltants, Inc. E INVIRONMENTAL 2540 Glenda Lane · Suite [08 · Dallas, Texas 75229 · (214) 620-9791 * Fax (214) 620-9794 GENERAL REPORT Report Date August 15, 1994 ' Inspection Date August 11, 1994 Client City of Coppell General Report No. 28 Project W.T. Cozby Library Coppell, Texas Identitication Field Inspection of Structural Steel Method of Test Visual Inspection Page/tl of I Results On August I I. 1994, a representative of GEE Consullanta, Inc. was present at thc above referenced project to perform thc following services: 1. Thc steel erector continues to erect radinsed trusses from grid linc *A" to 2. Wc were unable to find a connection detail for the bottom tubular chord ends to stub columns at line 'A*. 3. Thc roof metal deck was inspected from linc 'C* to · Wc marked up several places with red spray paint where puddle we[ds had been omitted. · At section of roof deck approximately 25 feet long at thc no~hwest corner along line "J' was tbund to span only two roof supports. Deck manufacturer recommends that deck ~ould span over a minimum of 3 roof supports. · A number of reef joist top chords have burnt holes due to excessive welding heat input. We request an approved fix from joist manufacturer. 4. Project drawings show bolts to be installed with the bolt head facing down along line "C' and at ent~' canopy. Majority of these bolts were installed inverted. 5. Wc request engineering review of linc 'C" truss, seat connections to clarify type of joint required. 6. Wc noted that a number of lajune 'A325" bolts connections north of line 'C'. We recommended replacing these bolts. Wc request engineering review. Our inspection was performed in accordance with project drawings and specifications. ce: Gary. Sicb- City of Coppcll Jim Bullock - F & S Partners Larry Davis - City of Coppcll Russell Williams - Brockctt¢ Davis Drake, Inc. Mike Sherpinakas - Diversified Construction Services, In~.