Loading...
CF-Cozby Library-LR 940815 (3)G EOTECHNICAL E GEE Consultants, Inc. E NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (2141 620-9791 · Fax (214~ 620-9794 August 15, 1994 Mr. Mike Sherpinskas Diversified Construction Services, Inc. 17110 Dallas Parkway, Suite 240 Dallas, Texas 75248 RE: Project No. C-94-0132 W. T. Cozby Public Library Coppell, Texas Dear Mr. Sherpinskas: In accordance with your request, a representative of GEE Consultants, Inc. obtained samples of the exposed material at pavement subgrade level at the above referenced project on August 10, 1994. The samples were transported to the laboratory and classification tests were performed. The test results are as follows: Sample A Sample Location: 20 feet west of Heartz and 55 feet south of the north end Sample Description: Brown Silty Clay Liquid Limit: 35 Plastic Limit: 12 Plasticity Index: 23 Percent Passing No. 200 Sieve: 71 Diversified Construction Services, Inc. Augnst 15. 1994 Sample B Sample Location: 120 feet east and 75 feet south of northwest corner Sample Description: Dark brown silty clay Liquid Limit: 28 Plastic Limit: 11 Plasticity Index: 17 Percent Passing No. 200 Sieve: 69 Sample C Sample Location: 20 feet east and 30 feet south of northwest corner Sample Description: Dark brown clay Liquid Limit: 55 Plastic Limit: 19 Plasticity Index: 36 Percent Passing No. 200 Sieve: 90 A lime series test was then performed on material obtained from sample C. The results of the lime series test are as follows: Percent Liquid Plasticity Lime Added Limit Index 0 55 36 4 33 7 6 33 14 8 31 5 Based on the above listed test results, we recommend that the subgrade of the proposed pavement be stabilized with the addition of six percent hydrated lime (approximately 27 pounds of lime per square yard, for a six inch thick stabilized layer). The lime stabilization should be performed in accordance with accepted plans and specifications. GEE Consultants, Inc. Proposal No. C-94-0132 Page 2 Diversified Construction Service, Inc. Augnst 15. 1994 If you have any questions or if you require further information, please do not hesitate to contact us. Sincerely, GEE Consultants, Inc. Richard W Gee,,zP2~2- Gary G. Huang · ~ Project Manager President ,.~"~*'~.-"'7 .... ~.o~ ..,- ,,,~..,. '...-% Geotechnical Engineering Division ~w: w,,-'..~,' '--~ GGH:RWG/lej ,, ,~c,~.~l.~ v~:',,~ ::::-' ~' '~ '~ 6;'235 },,*,,j;. :.:,.'.:-.-.' cc: Gary Sieb - City of Coppell ~, ,-.. ' Larry Davis - City of Coppell Mike Sherpinskas - Diversified Construction Services, Inc. Jim Bullock - F & S Partners Russell Williams - Brockette Davis Drake, Inc. GEE Consultants, Inc. Proposal No. C-94-0132 Page 3